Search Results for

    Show / Hide Table of Contents

    Vendor Rating in Purchase Line

    In this section, the COSMO Vendor Rating-specific fields on the purchase line are described.

    Duty of Rating

    This check box is selected if the Duty of Rating toggle is turned on in the Vendor Card and/or is set in the Item/Vendor Catalog page.

    Only the purchase lines that have the Duty of Rating check box selected are considered for the vendor rating.

    Assert Terms of Delivery

    This check box must be selected manually if the delivery date (Promised Receipt Date) and the shipment quantity are known.

    The check box will be selected automatically when releasing the order if the Assert Terms of Delivery on Release toggle is turned on in the Vendor Rating Setup page. An additional effect of this setting is that the value in the Planned Receipt Date field of the purchase line is copied to the Promised Receipt Date field if a promised receipt date has not been entered yet.

    If this check box is not selected automatically when releasing the order, the Promised Receipt Date must be entered manually. If this field is blank during the posting of the receipt, the receipt line will be rated with a score of 100 in the Due Date Rating.

    The ordered quantity must be entered in the Quantity field. The system automatically copies this value to the Assert Purchase Order Quantity field if the Assert Terms of Delivery check box is selected.

    Note

    If the value in the Quantity field is changed, then the Assert Terms of Delivery check box should be re-selected to refresh the quantity in the Assert Purchase Order Quantity field.

    Promised Receipt Date

    The promised receipt of goods date is transferred from the Planned Receipt Date field to the Promised Receipt Date field if the Assert Terms of Delivery check box is selected. This is the receipt date being promised by the vendor.

    This field must be filled before posting the receipt. Together with the Arrival Date, the promised receipt date serves as a calculation field for the automatic Due Date Rating of a shipment. This field was added because the actual delivery date may often vary profoundly from the posting date of the delivery and thus the delivery line rating would be falsified.

    Arrival Date

    Actual date of the receipt. This field is initialized with the posting date of the purchase order – if the Use Post. Date as Arrival Date toggle is turned on in the Vendor Rating Setup page – but can be changed manually by the user.

    Together with the Promised Receipt Date, the arrival date serves as a calculation field for the automatic Due Date Rating of a shipment.

    Assert Purchase Order Quantity

    Non-editable field that is filled automatically with the value from the Quantity field if the Assert Terms of Delivery check box has been selected by the user.

    Quality Rating

    Indicates if a quality rating exists for the purchase line. This rating can be entered by choosing the No value in the field or choosing Line > Quality Rating on the Lines FastTab. In the Quality Rating Code Document page, choose the relevant rating in the Code field.

    Quality ratings can also be done for posted receipts. For more information, see Quality Rating for Purchase Receipt Line.

    Note

    Entering a Quality Rating on the purchase line prior to receipt will only affect the Quality Rating Entries when the receipt is posted.


    Feedback
    Submit feedback for this page .

    In This Article
    Back to top 2025 © COSMO CONSULT - Data protection - Imprint