Concurrent Calculations in Discrete Manufacturing
This topic covers concurrent calculation functionality that is specific to COSMO Discrete Manufacturing.
Concurrent Calculation Documents
When a concurrent calculation is created, Line Types that are relevant for COSMO Discrete Manufacturing are added, including Document BOMs (quote and order), Construction Order, and Production Orders (expected and actual).
Include Resource Costs in Prod. Order (Actual) Calculation
Resource time (costs) can be posted to a construction order from the BOM Document Type, BOM Document No., and BOM Entry No. fields in the Resource Journal. These times are added to the Prod. Order (Actual) concurrent calculation.
For example, this could be used to include the cost of an engineer's time into the concurrent calculation. The engineer can post their time in the Resource Journal (which is transferred to the Construction Order) without needing a Production Order. These times are incorporated into the simultaneous costing and final costing using the document calculation.
Note
These costs only flow into the calculation, not into the price of the output item.