    Version 10.2.272514.0 of COSMO Advanced Manufacturing Pack adds improvements and fixes issues to enhance your overall experience.

    Release Date: April 3, 2025

    Note

    Tooltips and links have been added to the Module column to indicate the module name as well as links to the content. The links will either open new/changed topics or base content if changes do not exist, which could happen because content is in progress or the change doesn't affect content. The links will be updated as content is released.

    Feature changes

    The new features as well as any enhancements and/or improvements to existing functionality that are included in this release are listed in the following table.

    Pull Request Description Module
    PR14434 Added new logic to allow overplanning for resources in project planning processes. PR
    PR14715, PR15268, PR15276 Added project procurement tracking feature to facilitate better monitoring and management of procurement statuses, delays and signals. PR
    PR14837 Added Checklists to Service Lines. DM
    PR14925 Updated creation of Calculation Header to activate "Multi-Level Calculation" field for Calculation Types = "Doc. BOM (Job)" and "Construction Order (Job)". CA, DM
    PR14935 Set Status = Closed and "Order Tracking Relevance" = false in Document BOMs when the related Sales Order gets deleted after posting completion so that the Document BOM no longer creates demand. DM
    PR14937 Added "Country Region Code" field to Project Shipment pages and transfer to Shipment Project Ledger Entries. PR
    PR14953 Updated "Pre-Order Fully Assigned" field caption in Construction Order line. DM
    PR14968 Added new OAuth2.0 function with SecretText to Graphical Exension views in Discrete Manufacturing. GX, DM
    PR15046 Added support for Ext. Service Item prices in Calculation. CA, DM
    PR15048 Changed Assigned Resource context menu to open Project Process page instead of the Assigned Resources in Graphical Project Resource Planning view. GX, PR
    PR15062 Enhanced the Approved Vendor feature to allow more flexibility in handling all purchase documents. PM
    PR15069 Added progress bar to "Create Person Capacity" report. PR
    PR15084 Adjusted Graphical Extension grid limits to dynamically align with Project Manufacturing, ensuring proper scaling based on Project constraints. GX, PR
    PR15085 Updated drag-and-drop to support multiple resource allocation in Graphical Project Resource Planning view. GX, PR
    PR15101 Changed visibility of standard BC Project controls in COSMO Project pages. PR
    PR15118 Improved Graphical Project Resource Planning view to include related project lines based on shared resources and timeframe. GX, PR
    PR15126 Replaced current scheduling implementation of Document BOM and Construction Order with default Production Order scheduling. DM
    PR15146 Added option to include Cost Amount (Expected) from Item Purchase Receipts in Project WIP calculation. PR
    PR15164 Added color to mark the related lines in the Graphical Project Resource Planning view opened from the Graphical Project Planning view. GX, PR
    PR15176 Changed page type of the Graphical Project Resource Planning view to align it with the Graphical Project Planning view. GX, PR
    PR15214 Blocked editing of Master BOM Type / Checklist Type for certified documents. DM
    PR15218 Implemented use of Schedule Type from Project Setup if empty in Project Process Line to control vertical movement behavior in Graphical Project Resource Planning view. GX, PR
    PR15223 Added Acquisition Cost Principle to handle Indirect Cost % in Projects and Project Purchases. PR
    PR15273 Renamed existing "Procurement Signal" feature to "Procurement Status Signal". PR
    PR15294 Added Project Line Planning Predecessor option to Dependency context menu on Graphical Project Planning view. GX, PR
    PR15295 Added Copilot in Checklists (and Checklist Templates) to generate suggestions for filling out the checklist based on natural language and using Azure OpenAI. DM
    PR15305 Added checkout process for Checklist Templates and Master BOMs. DM
    PR15308 Added GXPR views (unflitered and filtered by My Projects) to Planning actions in "Project Manager COSMO Project" Role Center. GX, PR
    PR15309 Implemented a configurable color setup for project process lines with process channel Lead Time. GX, PR
    PR15321 Added option to Resource context menu in Graphical Project Resource Planning view that opens the Graphical Project Planning view filtered to display only the planning assigned to that resource within a specific time period. GX, PR

    Technical changes

    The technical changes (such as new integration events, permission set changes, etc.) that are included in this release are listed in the following table.

    Pull Request Description Module
    PR14715, PR15062, PR15126, PR15176 Updated/changed "CCS AMP ALL" permission set. DM, PM, PR
    PR14916 Added new procedure to filter Project Budget Line sub structures. PR
    PR15136 Made DescriptionIndent variable globally accessible in Production Structure subforms. PM
    PR15262 Added parameter to an existing event and added a new event to "CCS DM Document BOM Mgt." codeunit. DM
    PR15271 Added integration events to "CCS PQM Management" codeunit. PQM
    PR15280 Added Pre-Order checks while updating Construction Orders. DM
    PR15281 Added subscribers to OnAfterCopyJob in "CCS PR Job Copy" report. PR
    PR15311 Added integration event to "CCS PR Job Invoicing Mgt." codeunit. PR
    PR15332 Added integration event to CCS AMP Purchase Line" table extension. PR
    PR15350 Applied new development and branching strategy. AMP

    Bugfixes

    The issues from the previous version of the app that were fixed in this release are listed in the following table.

    Pull Request Description Module
    PR14687 Fixed automatic creation of Assembly Orders for Project Sales Order lines. PR
    PR14979 Added Standard Unit Cost in Calculation for Service Order/Quote lines. CA
    PR14995 Fixed missing "Main Project No." in Project Ledger Entries from some General Journal postings and cancelled posted Purchase Receipt lines. PR
    PR15004 Added Subcontracting with Warehouse Receipt and Ext. Service Item. DM
    PR15015 Fixed filter when opening Graphical Project Planning and Graphical Project Resource Planning views from My Project in PR Role Centers. GX, PR
    PR15017 Fixed creation of Service Items on Project Sales Invoice Posting. PR
    PR15081 Fixed error that Essential experience users received when deleting a Project Calculation Group. PR
    PR15131 Fixed inconsistencies when deleting Purchase Quotes created by Purchase Quote Manager. PQM
    PR15151 Fixed error with custom page view "Project No." filter in Project Budget pages. PR
    PR15220, PR15232 Fixed reset of project shortcut dimension fields in Copy Project report. PR
    PR15248 Added ability to manually complete a subcontracting process after deleting partly delivered transfer order. DM
    PR15275 Fixed reset of Summary Unique No. field in copy procedures. PR
    PR15287 Fixed certification error for Production Structure Variants. PM
    PR15320 Fixed missing "Job No" and "Job Line Unique No." in assigned resources. PR

    Hotfixes

    The hotfixes for this release are listed in the following table.

    Hotfix No. Release Date Pull Request Description Module
    N/A N/A N/A N/A N/A

    Removed or deprecated features

    The obsolete controls, objects, and methods that were removed or deprecated in this release are listed in the following table.

    Pull Request Type Description Replaced by Module
    N/A N/A N/A N/A N/A

    Technical specifications

    The required minimum version of Business Central, COSMO Licensing, and any dependent apps are listed in the following table.

    Details Version
    Requires Microsoft Base Application 25.3.0.0
    Requires COSMO Licensing 2.7.0.0
    Requires COSMO Graphical Extension 6.1.266344.0

    Feedback
    Submit feedback for this page .

    In This Article
    Back to top 2025 © COSMO CONSULT - Data protection - Imprint