Search Results for

    Show / Hide Table of Contents

    What's new in version 11.1

    Version 11.1.298048.0 of COSMO Advanced Manufacturing Pack is a Hotfix of the 11.1.296170.0 release.

    Version 11.1.296170.0 of COSMO Advanced Manufacturing Pack is a Hotfix of the 11.1.295489.0 release.

    Version 11.1.295489.0 of COSMO Advanced Manufacturing Pack adds improvements and fixes issues to enhance your overall experience.

    Release Date: August 7, 2025

    Feature changes

    The new features as well as any enhancements and/or improvements to existing functionality that are included in this release are listed in the following table.

    Pull Request Description Module
    PR16262 Added "Checklist" and "Document BOM" actions to "Project Planning and Processing" page. DM, PR
    PR16270 Added new feature to always use the Project Calc. Direct Cost from the item for Project Budget Calculation. PR
    PR16233, PR16494 Redesigned "Apply Purchase Conditions" actions in PQM and PR to streamline process to reduce necessary user input, unify code under COSMO Project Manufacturing, and keep information about source purchase quote in price lists. PR, PQM
    PR16248 Added support for foreign currency with charge price handling in Checklists. DM, PR
    PR16255 Added charge amounts from item sales prices for Checklists. DM, PR
    PR16273 Added "Transfer Lines to Project Budget" function to Document BOM (similar to "Transfer Lines To Sales Document" function but for projects). DM, PR
    PR16302 Added new "Account Current Line" fields to "Bank Account" table and pages. PR
    PR16304 Improved "Item Disposal per Period" with components having only Setup Time on one period. DM
    PR16335 Added variable attributes to Service Lines. DM
    PR16349 Added "Update Quantities" action to Planning Processes page which transfers the quantity from the Project Budget Line to the planning lines. PR
    PR16351 Improved "Copy from" function in Project Budget Calculation to allow selection of more than one parent line.
    Renamed option "Current position with substructure" to "Selected positions with substructure".
    PR
    PR16361 Added validation of Manufacturing Dimension Values to Production BOM/Master BOM. DM, PM
    PR16366 Added "Attribute Value Search" action to CTO Role Center. DM
    PR16367 Added "Baseline" comparison feature for Project Planning lines. PR
    PR16368 Added fields for Service to CTO Setup Wizard with default values. DM
    PR16376 Added "Default Project Dimension Value Posting" field to Projects Setup page. PR
    PR16377 Added ability to add new items to an empty Service BOM in Service Order Repair process. DM
    PR16379 Added global toggle to show completed projects in Project List page. PR
    PR16415, PR16491 Created "Graphical Resource View" grouped by Resource Team for project. GX, PR
    PR16416 Added Repair choice to Service Order Type. DM
    PR16417 Added "Item Units of Measure" to Sales Restrictions functionality. PM
    PR16420 Added action groups for graphical project views in PR Project Manager Role Center and My Projects page. GX, PR
    PR16422, PR16424 Improved the displayed information in the "Subcontracting Prod. Order" and "Subcontracting Assembly" pages, especially when more than one Transfer Orders was used. DM
    PR16442 Added "Process Planning Block View" option to Graphical Project Resource Planning context menu. GX, PR
    PR16448 Added display of scheduled resources in tooltip on Graphical Project Resource Planning views. GX, PR
    PR16449 Updated context menu handling on Graphical Project views. GX, PR

    Technical changes

    The technical changes (such as new integration events, permission set changes, etc.) that are included in this release are listed in the following table.

    Pull Request Description Module
    PR16006, PR16350 Added integration events to multiple codeunits. PM
    PR16183 Added new integration event and set variables as protected in "CCS PR Plan. Res. Alloc. Mtx" and "CCS PRPL Planning Res. Alloc." pages. PR
    PR16215 Activated renumbered objects and publishers (Clipboard and Change tables). DM
    PR16232 Added integration event to "CCS DM Variable/Attribute Mgt." codeunit. DM
    PR16233, PR16335, PR16367, PR16415 Updated/changed "CCS AMP ALL" permission set. AMP
    PR16235 Added integration events to "CCS DM Document BOM Mgt." codeunit. DM
    PR16236 Added integration events to "CCS DM Standard Task Mgt." codeunit. DM
    PR16244 Added integration events to "CCS DM Formula Interpreter" codeunit. DM
    PR16245 Added integration events to "CCS DM Const. Line to Mfg." codeunit. DM
    PR16285 Updated code for Business Central 26 compatibility. PR
    PR16322 Improved performance in "CCS PRPL Job Process Mgt." codeunit. PR
    PR16336 Added new integration event to "CCS PX Work Center Prod. Rate" table. PR
    PR16340 Added integration event OnTransferBOMOnBeforeTransferReservation to "CCS DM Const. Line to Mfg." codeunit. DM
    PR16371 Moved code of UpdateOutlineNo procedure to "CCS PRPL Job Process Mgt." codeunit. PR
    PR16362 Added integration events to "CCS DM Enclose Management" codeunit. DM
    PR16325 Added integration event OnAfterCalcSubBOM to "CCS DM Construction Line Mgt." and "CCS DM Document BOM Mgt." codeunits. DM
    PR16477 Added new integration events to "CCS PX Sequence Planning" codeunit. PM

    Bugfixes

    The issues from the previous version of the app that were fixed in this release are listed in the following table.

    Pull Request Description Module
    PR16176 Fixed issues with Document BOM lines transferred to Sales Documents marked as "Transferred Line deleted". DM
    PR16181 Added logic to update Document BOM expected quantities on Project Budget Line quantity change. DM, PR
    PR16258 Fixed calculation of grid limit dates to ensure accurate display ranges and improved consistency and reliability of date boundaries in the grid. GX, PR
    PR16299 Fixed issue in which the BOM update check in the Construction Order page was called too many times and could lead to an error. DM
    PR16311 Skipped availability check for components without Remaining Quantity in Components Planning Pool. PM
    PR16316 Fixed missing transfer of attributes when using "Purch. G/L Acc./Item" action from Construction Lines. DM
    PR16319 Fixed display of references in Subcontracting pages. DM
    PR16331 Fixed issue with creating GXPR Project Planning task structure using Process Outline No. from Project Line Process. GX, PR
    PR16344 Fixed issue with Compare and Update function for Construction Lines. DM
    PR16356 Fixed incorrect Routing No. in Production Order created from Production Structure. PM
    PR16374 Fixed price calculation on automatic BOM expansion for items with price base "Price". PR
    PR16413 Fixed issue in which the Bin Code was copied from Construction Order to Repair Service Line even though Bin Code should be empty. DM
    PR16439 Fixed issue in which the quantity for Construction Lines could be calculated with "1" instead of the actual needed quantity. DM
    PR16447 Fixed wrong "Quantity per" when creating Production Order from Document BOM or Construction Order and "Calculation Formula" was used. DM
    PR16480 Fixed missing Attributes (DM) when using the "Copy Document" action from posted Shipments/Receipts and Invoices. DM

    Hotfixes

    The hotfixes for this release are listed in the following table.

    Hotfix No. Release Date Pull Request Description Module
    11.1.298048.0 2025-08-21 PR16515 Added new integration event to "CCS PX Sequence Planning" codeunit. PM
    PR16553 Fixed price calculation of project travel codes in Project Journal lines. PR
    PR16560 Added integration event to "CCS PR Plan. Res. Alloc. Mtx" page. PR
    PR16582 Fixed issue preventing opening of Assigned Project Lines context menu on Graphical Project Resource Planning and Graphical Resource by Team views. GX, PR
    PR16589 Fixed "Line No." calculation for attributes when using Construction BOM Compare & Update feature. DM
    PR16594 Added missing Application Areas for "Transfer Purchase Conditions", which required PQM to be enabled in the PR product configuration. PR, PQM
    PR16604 Fixed filter for "Process Planning" action in "Version Project Budget Calculation" page. PR
    PR16605 Added integration event to "CCS DM Doc BOM to Mfg." codeunit. DM
    11.1.296170.0 2025-08-11 PR16520 Fixed "Planning" action group in "CCS PR PROJECT MANAGER" Role Center. PR
    PR16521, PR16522 Updated de-DE, de-AT, de-CH, and pl-PL translations. AMP
    PR16524, PR16534 Added integration events to "CCS DM Service-DM Management" codeunit. DM
    PR16532 Fixed missing Manufacturing Date on Physical Inventory Order posting. PM

    Removed or deprecated features

    The obsolete controls, objects, and methods that were removed or deprecated in this release are listed in the following table.

    Pull Request Type Description Replaced by Module
    PR16215 Deactivated objects/publishers Deactivated obsolete renumbered objects and publishers (Clipboard and Change tables). Renumbered objects and publishers. DM
    PR16393 Obsoleted field Obsoleted miscalculated "CCS PR Comment" field in "Job Ledger Entry" table extension. - PR
    PR16425 Obsoleted procedure Set no longer needed procedure to obsolete. Same new procedure also in page action as in field control. DM

    Technical specifications

    The required minimum version of Business Central, COSMO Licensing, and any dependent apps are listed in the following table.

    Details Version
    Requires Microsoft Base Application 26.0.0.0
    Requires COSMO Licensing 2.7.0.0
    Requires COSMO Graphical Extension 7.2.295286.0

    Feedback
    Submit feedback for this page .

    In This Article
    Back to top 2025 © COSMO CONSULT - Data protection - Imprint