Search Results for

    Show / Hide Table of Contents

    What's New in Version 12.1

    Version 12.1.310989.0 of COSMO Advanced Manufacturing Pack adds new features and improvements to enhance your overall experience. This release includes new production order planning capabilities from project procurement, enhanced functionality for graphical project resource planning, purchase quote management enhancements, integration events for improved extensibility, and various fixes to improve system stability.

    Release Date: October 30, 2025

    Feature Changes

    The new features as well as any enhancements and/or improvements to existing functionality that are included in this release are listed in the following table.

    Pull Request Description Module
    PR15902 Added ability to create production orders with "Planned" status from project procurement. Project-related production orders with planned status are no longer deleted during planning calculations. PR
    PR17083 Enhanced subcontracting assembly functionality by renaming "Subcontracting Assembly" page to "Subcontracting Assembly Order", improving field visibility by hiding unused fields, and adding "Old Location Code" and "Old Bin Code" fields to Assembly Order Subform and Assembly Lines. DM
    PR17268 Added "Lead Time Calculation" field to "Purchase Quote Subform" page to enable transfer of lead time calculation values to the Vendor Item Catalog through the "Transfer Purchase Conditions" action. PQM
    PR17316 Added "Project Schedule Entries" to context menu in Graphical Project Resource Planning views to provide direct navigation access to project scheduling functionality. GX, PR
    PR17321 Added variant mandatory validation on production structure pages (Development, Laboratory, Manufacturing, and Production Structure) to align with "Variant Mandatory if Exists" setting in the Item Card. The validation now enforces variant code requirements in the production structure line when creating production orders from these structures and includes coverage for recipe type sharing. PM
    PR17333 Added confirmation dialog for initial "COSMO Project Setup" creation with information about consequences and event subscriber activation. Added non-editable "COSMO Project Event Subscribers Active" page control with tooltip explaining deactivation through deletion. PR
    PR17366 Added "Block View Project Processing Procurement" action to context menu in Graphical Project Resource Planning views for enhanced procurement management access. GX, PR
    PR17375 Updated messages/labels in Maintenance/Setup Matrix Line and Default Manufacturing Dimension tables. PM

    Technical Changes

    The technical changes (such as new integration events, permission set changes, etc.) that are included in this release are listed in the following table.

    Pull Request Description Module
    PR17127 Added new integration event OnAfterCCSDMSplitSalesLine in "CCS AMP Sales Line" table extension within the CCSDMSplitSalesLine procedure to allow for custom processing when sales lines are split in Document Management functionality. DM
    PR17148 Added integration event to "CCS DM Subscribers" codeunit in PeteringOutItem procedure for enhanced extensibility options. DM
    PR17245 Added integration event to "CCS PX Sequence Planning" codeunit for improved customization capabilities in process manufacturing planning. PM
    PR17254 Refactored "Copy Project" report logic into new codeunit "CCS PR Copy Job Mgt." with new temporary option buffer table "CCS PR Copy Job Option Buffer" for improved expandability and customer extensibility. PR
    PR17254, PR17331 Updated/changed "CCS AMP ALL" permission set. AMP, DM, PR
    PR17266 Added OnInsertOnBeforeSetUniqueNo integration event to "CCS PR Job Line Budget" table, enabling improved customization capabilities for project budget line creation processes. PR
    PR17285 Added integration events to "CCS DM Service-DM Management" codeunit and "CCS AMP Service Header" table extension, and made local procedure CopyAttrFromServiceLineToConstructionLine() available as global procedure for enhanced Service Repair process extensibility. DM
    PR17401 Added new integration events OnGetNewBOMNoOnGetProdBOMVersionNoOnBeforeGetProcessManufacturingSetup() and OnGetNewBOMNoOnGetRecipeVersionNoOnBeforeGetProcessManufacturingSetup() to "CCS PM Prod. Structure Mgt." codeunit for improved extensibility in production structure management. PM

    Bugfixes

    The issues from the previous version of the app that were fixed in this release are listed in the following table.

    Pull Request Description Module
    PR17065 Fixed missing assignments for "Outstanding Quantity" and "Outstanding Quantity (Base)" fields in "Project Journal Line" table. The fields were not consistently calculated into each other, causing discrepancies in quantity transfers. Added recalculation logic and corrected field assignments to use proper base and unit of measure quantities. PR
    PR17076 Fixed "Detailed Planning" action in "Project Planning and Processing" page where collapsed project structure lines could cause empty planning pages and corrupt project structure. PR
    PR17214 Fixed infinite loop in GetWBSPath procedure caused by malformed Project Budget structures with circular references or missing parent records, preventing system hangs during WBS path calculations. PR
    PR17226 Fixed error when creating an item from a laboratory structure line with an empty item number and a unit of measure equal to the base unit of measure in the used item template. PM
    PR17254 Fixed creation of unused DM checklists during project copying. DM, PR
    PR17262 Fixed incorrect reservation availability for Construction Order Headers, Document BOM, and Construction Lines that are no longer relevant. DM
    PR17267 Fixed graphical resource planning display to show empty "Work" and "Duration" fields for assigned resources. GX, PR
    PR17272 Fixed an error in the Production Journal that occurred when changing the Posting Quantity field with item tracking lines present and the "Use Posting Qty. and Scrap Defaults in Prod. Journal" setting enabled. Added validation logic to prevent updates for production order components with "Calculation Formula" = "Fixed Quantity", ensuring only relevant lines are updated and users are notified when item tracking lines prevent updates. PM
    PR17306 Fixed missing field resets in Project Budget Line replacement logic when changing the "No." field. Previously, unchanged fields from the new master data record retained previous values instead of being reset, causing data inconsistency. Added proper field reset functionality to replacement logic and "Search and Replace Component" action. PR
    PR17317 Fixed wrong Production Order No. assignment on Service Item Cards when Production Order lines are split and Serial Numbers are used. The system now correctly uses Serial Numbers to identify the proper Production Order for Service Item creation instead of always assigning the last created Production Order. DM
    PR17331 Fixed "Missing Planning Setup" validation error in Project Time Entry Worksheet. PR
    PR17346 Fixed manufacturing dimension set record deletion issue where filtering manufacturing dimensions on production order lines using search box or dimension value code filters would incorrectly save only filtered records instead of complete manufacturing dimension record set when closing the "Mfg. Dimension Set Entries" page. PM
    PR17359 Fixed issues with immediately opening Checklists in Sales and Service Documents when "Default Item Quantity" is activated in Sales & Receivables Setup. DM
    PR17367 Fixed Production View setup retention when creating a Construction Inquiry from a Document BOM. DM
    PR17387 Fixed Purchase Line "Direct Unit Cost" currency conversion when Purchase Header currency is changed. Previously, Direct Unit Cost was reset to pre-change value, causing incorrect currency amounts (e.g., thousands of Euros becoming thousands of US Dollars). Added proper currency exchange calculation to maintain correct cost values in new currency. PR
    PR17390 Fixed Project List page filter functionality for completed projects when "Project Person Filter" is activated on Resource Card. Removed additional "Complete = false" filter that prevented showing completed projects. PR

    Hotfixes

    The hotfixes for this release are listed in the following table.

    Hotfix No. Release Date Pull Request Description Module
    N/A N/A N/A N/A N/A

    Removed or Deprecated Features

    The obsolete controls, objects, and methods that were removed or deprecated in this release are listed in the following table.

    Pull Request Type Description Replaced by Module
    PR15902 Obsoleted field Obsoleted "CCS PR Def. Prod. Order Status" field in "Jobs Setup" page. New field "Default Production Order Status" using "Production Order Status" enum in "Jobs Setup" page. PR
    PR17331 Obsoleted codeunit Obsoleted codeunit 5292753, "CCS PRPL Stand. Event Subscr.". 5292482 "CCS PR Standard Event Subscr." PR

    Technical Specifications

    The required minimum version of Business Central, COSMO Licensing, and any dependent apps are listed in the following table.

    Details Version
    Requires Microsoft Base Application 27.0.0.0
    Requires COSMO Licensing 2.7.0.0
    Requires COSMO Graphical Extension 7.3.301069.0

    Feedback
    Submit feedback for this page .

    In This Article
    Back to top 2025 © COSMO CONSULT - Data protection - Imprint