This section describes setup and functionalities that relate to Production Structures in COSMO Process Manufacturing.

The following table describes a sequence of tasks, with links to the topics that describe them.

To See
Learn about the fields and actions on the Production Structure page. Production Structure Setup
Learn the difference between production BOMs and recipes. Production BOMs vs. Recipes
Learn about the fields and actions on the Production BOM page that relate to recipes. Recipes
Calculate density with unit of weight and unit of volume. Unit of Weight and Unit of Volume
Assign default location and bin codes to production structure lines for transfer to production order components. Default Location/Bin Codes
Learn about routings and setting up parallel operations in Production Structure lines. Routings
Choose which sequence work center in the Production Structure lines should be used for sequence planning if multiple sequence work centers are entered. Identify Operation for Sequence Planning
Learn how setup times and production rate values of machines are used for calculating Production Orders if the routing line has no data. Work Center Production Rates
Set a constant production rate time on certain intervals of the production rate quantity. Fixed Step Production Rate Time
Add additional products to an existing recipe. Incorporation
Automatically calculate the optimal quantity per unit of measure on Production Structure lines. Calculation Unit of Measure
Create different production structures for one item depending on criteria such as locations, units of measure, and quantities. Production Variants
Simulate the calculation of a certain quantity for the needed work operations and materials in a Production Structure. Production Structure Simulations
Search production BOMs and exchange items in Production Structure lines. Exchange Production BOM Item in Production Structure