Search Results for

    Show / Hide Table of Contents

    Advanced Construction Suite Setup

    The Advanced Construction Suite Setup page has one field for defining a general component as well as access to version information.

    1. Choose the Lightbulb that opens the Tell Me feature icon, enter Advanced Construction Suite Setup, and then choose the related link.
    2. In the BoQ Position Component Code field, enter the default general component that will be used in the Project Lines for BoQ positions. This setting defaults to the Import BoQ To Project dialog page.
    3. Turn on the Use Item Assignment toggle if items (Type = Service) from the BoQ Unit of Measure Assignment should be used when importing a BoQ. This setting defaults to the Import BoQ To Project dialog page.
      For example, BoQ positions with Unit of Measure Code = PCS need to use service item number E-DU20 in the BoQ Budget Calculation. If this toggle is turned on, all BoQ positions with Unit of Measure Code = PCS will be set with Item No. = E-DU20 during import.
    4. Choose the About action to view version and copyright information about the Advanced Construction Suite app.

    See Also

    BoQ Process


    Feedback
    Submit feedback for this page .

    In This Article
    Back to top 2025 © COSMO CONSULT - Data protection - Imprint