Search Results for

    Show / Hide Table of Contents

    Capacity Calculation Groups

    The capacity calculation groups relate to capacity in work centers.

    This information – as well as item calculation groups – is used to make a grouping of capacities within a routing and to represent this value in separate calculation lines.

    Capacity calculation groups can be entered in the Calculation Group Code field in the following pages:

    • Machine Center Card, Posting FastTab
    • Work Center Card, Posting FastTab

    The Sales Calculation is set up to have production and tool costs calculated separately.

    Note

    To ensure that the values for the capacity costs are correct after calculation, all work centers included in the routing must have a value in the Unit Cost field.


    Feedback
    Submit feedback for this page .

    In This Article
    Back to top 2025 © COSMO CONSULT - Data protection - Imprint