Search Results for

    Show / Hide Table of Contents

    Update and Compare Construction Orders

    In complex manufacturing environments, you often need to compare and synchronize similar technical structures without rebuilding them from scratch. The Construction BOM Compare & Update feature lets you compare a source structure with a target structure and selectively apply differences — with full user control.

    With this feature, you can:

    • Detect insertions, deletions, modifications, and movements based on configured fields and hierarchy context.
    • Review all changes in a structured dialog with clear visual indicators.
    • Apply selected changes to the target while retaining full control over each step.

    The comparison logic supports:

    • BOM structure (Construction Lines and sub-lines).
    • Manufacturing Data (dimensions, attributes, quality, tools, personnel).
    • Field-level differences based on BOM compare field configuration.
    • Recursive comparison for nested Construction Lines (via the Belongs to Entry No. relationship).
    • Movement consolidation: uniquely detectable parent changes are shown as "Move" (instead of "Insert" and "Delete").
    • User-confirmed updates for full control.

    Comparison can be initiated from several sources and applied to the selected target:

    • Master data (Production BOM and Routing / Master BOM)
    • Construction Order
    • Construction Order Archive
    • Document BOM
    • Document BOM Archive
    Note

    A common scenario is Construction Order ↔ Construction Order. The same compare mechanism also supports master data → Construction Order, and Document BOM ↔ Construction Order/archive combinations. Changes are always applied to the document you select as the target during compare.

    The intended usage model and scope of the Construction BOM Compare & Update feature includes:

    • Compare scope: Compares a defined source with a defined target (Construction Order ↔ Construction Order, master data → Construction Order, Document BOM/archives). The engine detects Inserts, Deletes, Modifies, and Moves and lets you apply selected changes to the chosen target.
    • Recommended practice for growing BOMs: Model structural decisions in master data and adopt them into Construction Orders at defined milestones/batches. This reduces parallel, conflicting edits across master data and open Construction Orders.
    • Move usage: Movement (re‑parenting) is user‑initiated (Auto Move or Move). Only uniquely matchable "Insert"/"Delete" pairs are converted; ambiguous cases remain "Insert"/"Delete" for user decision.
    • Out of scope: A generic, rule‑based auto‑adoption engine and fully simultaneous change management across master data and existing Construction Orders are not part of the Compare/Update framework.

    The following table outlines related tasks, with links to the topics that describe them.

    To See
    Configure the fields to be included in the compare and update process. BOM Compare Field Configuration
    Learn how the Insert, Delete, Modify, and Move actions are determined and applied during BOM compare and update. Action Types in BOM Compare
    Use the Construction BOM Compare & Update feature. Compare and Update Construction Orders

    Feedback
    Submit feedback for this page .

    In This Article
    Back to top 2025 © COSMO CONSULT - Data protection - Imprint