Search Results for

    Show / Hide Table of Contents

    BOM Change Log

    The BOM Change Log lists changes made to production BOMs or master BOMs based on the setting in the Production BOM Log and/or Master BOM Log fields in the Configure to Order Setup page.

    Log Tracking Options

    The logging behavior depends on the selected field option in the Configure to Order Setup page:

    • Status Change – Creates certification snapshots. Every time a BOM is set to Certified, a new log line with Status = Open is created. When the BOM is changed back to Under Development, this line does not switch to In Progress. On the next certification, another new Open line is added. Status Change focuses on certification events.
    • Version Code – Creates one ongoing log entry per version. The entry's status changes as the version evolves: Open ↔ In Progress → Finished.
    • BOM Number – Creates one ongoing entry per BOM number. The entry's status mirrors the current source state. The BOM Source Version Code field shows the latest changed version.

    Status Mapping

    The log entry status reflects the BOM source status:

    • Certified → Open
    • Closed → Finished
    • Non-certified (e.g., Under Development, New) → In Progress

    Status Transitions:

    • Ongoing entries switch to In Progress during development and back to Open upon certification. A new Open line is created only when the previous entry is Finished.
    • For log type Status Change, development phases do not flip the snapshot to In Progress; certification updates or creates the Open snapshot based on recency.

    Tip

    Use BOM Number or Version Code when you want a continuous lifecycle per BOM/version. When a BOM is set to Closed, the ongoing entry becomes Finished. A subsequent certification starts again with an Open entry (a new line if the previous one is Finished).

    Hover over the fields in the BOM Change Log page for a brief description.

    Open Source Documents

    The source documents that created the log entries can be opened from the following fields:

    • BOM Source No. – Production BOM / Master BOM
    • BOM Source Version Code – Production BOM Version / Master BOM Version
    • Construction Orders – Construction Orders where the BOM is used from a previous state or where one or more lines contain such BOM reference

    The source documents can also be opened from the actions on the Related menu.

    Open Log Entries Cue in Role Center

    In the Configure to Order Design Engineer Role Center, the BOM Change Log cue shows the number of open change log entries (Status = Open by default) and can be used to quickly open the BOM Change Log page.

    Tip

    If you want active development to be visible, the cue filter can be extended to include Status = Open | In Progress.

    Changing Status

    To change the status of the log entries, select the entry or entries and then choose the Finish action. Alternatively, you can manually change the Status field on individual lines. The Status will change to Finished and the entry/entries will be removed from the cue.

    Note

    The BOM Change Log can also be accessed using the Tell Me feature.


    Feedback
    Submit feedback for this page .

    In This Article
    Back to top 2025 © COSMO CONSULT - Data protection - Imprint