Search Results for

    Show / Hide Table of Contents

    What's new in version 5.1

    Version 5.1.127284.0 of COSMO Advanced Manufacturing Pack adds various features to service functionality in COSMO Discrete Manufacturing; adds the Graphical Operation Scheduling view in COSMO Process Manufacturing; and adds Planning Processes to the context menu in the Graphical Project Planning view in COSMO Project Manufacturing.

    Additionally, recipes from COSMO Process Manufacturing that are used as source BOMs when requesting BOMs in Document BOMs/Construction Orders/Service BOMs in COSMO Discrete Manufacturing have been integrated to use the Share % to calculate the Quantity Per.

    Features and enhancements

    The following features are included in this release:

    Pull Request Description Module
    PR6526 Redesigned ENUM usage. PR, PQM, PRPL
    PR6549 Added comments to explain placeholders in labels. AMP, CA, DM, GXPR, GXPX, PM, PQM, PR, PRPL, PX
    PR6576 Integrated Recipes from PM to Document BOMs/Construction Orders/Service BOMs in CTO. DM, PM
    PR6581 Deleted the duplicate confirmation when making automatic reservation in Document BOM or Construction Line. DM
    PR6569, PR6605 Added code to prepare for the removal of old price calculation. PR, PQM
    PR6587, PR6799 Added "Building Site-To Code" field to various Service pages. DM
    PR6636, PR6800 Allowed use of third-party Service Items in Service Quotes and Orders. DM
    PR6635, PR6656, PR6658 Changed dimension logic for BC20 to conform to new standard. DM, PM, PR, PX
    PR6657 Added new actions on Service Item Card/List pages to create Service Quote/Order with current Service Item. DM
    PR6668 Increased length of "WBS" field in "CCS PR Job Calc. Schedule" table. PR
    PR6695 Deleted duplicate code in "CCS PX Default Mfg. Dimension" table. PX
    PR6706 Added new publisher to "CCS PM Prod. Struct. Line" table. PM
    PR6738 Changed "TransferDocBomToConstrLines" to global procedure in "JobProcurementMgt" codeunits. PR
    PR6739, PR6750 Added Events in "CCS PR Job Procurement Mgt." codeunit. PR
    PR6743 Added parameters to event publisher "OnBeforeSaveDefaultMfgDim". PX
    PR6744 Code uniformity for better maintenance. AMP, CA, DM, GXPR, GXPX, PM, PQM, PR, PRPL, PX
    PR6767 Updated GX License granule. GXPR, GXPX
    PR6770 Created Graphical Operation Scheduling view with extended drag & drop function and for all work centers. GXPX
    PR6722 Created "OnBeforeProdOderCreate" event in "CCS PM Prod. Structure Mgt." codeunit. PM
    PR6783, PR6818 Added Planning Processes to summary job planning process line in Graphical Project Planning view context menu. GXPR
    PR6787 Added inability to move summary job planning process lines in Graphical Project Planning view and updated move function. GXPR
    PR6813 Added new event publishers for Checklists. DM
    PR6819 Applied GX Process Interface to GXPX for improved performance. GXPX
    PR6823 Removed Navigation FastTab from GXPR and GXPX views. GXPR, GXPX
    PR6824 Changed labels and captions for consistency. DM
    PR6839 Added "OnBeforeCreateReopenInvLines" event in "CCS PR Job Sales Mgt." codeunit. PR
    PR6840 Added GXPR implementation to GX Process Controller Interface. GX, GXPR
    PR6842 Added "Job No." to page caption on filtered views. GXPR
    PR6849 Performance and table lock improvement for Job Line Budget. PR

    Bugfixes

    This release fixes the following issues found in the previous version of the app:

    Pull Request Description Module
    PR6576 Fixed issue when transferring production BOMs with line Type = Production BOM to CTO BOMs with line Type = Master BOM, the lower levels were not calculated. DM
    PR6780 Fixed missing Procurement Location Code for Construction Orders. PR
    PR6805 Fixed issue where "Global Mfg. Dim." fields in Prod. Order Lines were not filled out when synchronization between DM Attributes and Mfg. Dimensions was used. DM, PX
    PR6838 Updated dependency lines in GX Project Planning view. GXPR, GXPX
    PR6845 Fixed possible Item Unit of Measure error when calculating multilevel Production Orders with Production Structures. PM
    PR6860 Fixed issue where "Lot No. Trading Unit" field was not filled from "Serial No." in Item Tracking. PM

    Hotfixes

    The following hotfixes are included in this release:

    Hotfix No. Pull Request Description Module
    N/A N/A N/A N/A

    Removed or deprecated features

    Removed obsolete controls, objects, and methods:

    Pull Request Description Module
    N/A N/A N/A

    Technical specifications

    Details Version
    Requires Microsoft Base Application 20.3.0.0
    Requires COSMO Licensing 1.1.0.0
    Requires COSMO Graphical Extension 3.0.126581.0

    Feedback
    Submit feedback for this page .

    In This Article
    Back to top 2025 © COSMO CONSULT - Data protection - Imprint