Search Results for

    Show / Hide Table of Contents

    Drawing Transfer Across Procurement Documents

    This section explains how Drawing Sets flow from engineering/master data into operational procurement documents in project environments. It covers all active procurement channels: Purchase Quote, Purchase Order, Production Order, Service Order, Construction Order, and Assembly Order.

    Drawing Set Source by Document Type

    This table summarizes how Drawing Sets flow from engineering/master data into operational procurement documents.

    Document Type Document Level With Document BOM Without Document BOM
    Project Budget Line Line Merged from Master BOM/Production BOM/Routing From selected BOM source (Production BOM or Assembly BOM)
    Procurement Line Line Inherited from Project Budget Line Inherited from Project Budget Line
    Production Order Header/Line From Procurement Line From Procurement Line
    Production Order Components From Document BOM lines From Production BOM lines
    Production Order Routing Lines From Document BOM From Routing lines
    Service Order Service Item Line From Procurement Line From Procurement Line
    Assembly Order Header From Procurement Line From Procurement Line
    Assembly Order Lines From Assembly BOM lines From Assembly BOM lines
    Construction Order Header Procurement Line and Document BOM (merged) From Procurement Line
    Construction Order Lines From Document BOM source lines From Master/Production BOM/Routing lines or Item
    Purchase Quote/Order Line From Document BOM From Procurement Line, Construction Order line, or Item

    Transfer Flow Diagram

    These diagrams illustrate the Drawing Set transfer process with and without a Document BOM.

    With Document BOM (Merged Drawing Sets)

    ┌─────────────────────────────────────────────────────────────────────────────┐
    │                           ENGINEERING SOURCES                               │
    ├─────────────────┬─────────────────┬─────────────────┬───────────────────────┤
    │   Master BOM    │  Production BOM │     Routing     │     Assembly BOM      │
    └────────┬────────┴────────┬────────┴────────┬────────┴───────────┬───────────┘
             │                 │                 │                    │
             └────────────┬────┴────────┬────────┘                    │
                          ▼             ▼                             │
                  ┌───────────────────────────┐                       │
                  │      Document BOM         │                       │
                  │   (Merged Drawing Set)    │                       │
                  └─────────────┬─────────────┘                       │
                                ▼                                     │
                  ┌───────────────────────────┐                       │
                  │   Project Budget Line     │◄──────────────────────┘
                  │  (Consolidated Drawing)   │
                  └─────────────┬─────────────┘
                                ▼
                  ┌───────────────────────────┐
                  │     Procurement Line      │
                  └─────────────┬─────────────┘
                                │
             ┌──────────┬───────┼───────┬──────────┬──────────┐
             ▼          ▼       ▼       ▼          ▼          ▼
       ┌──────────┐ ┌───────┐ ┌─────┐ ┌─────────┐ ┌────────┐ ┌────────┐
       │Production│ │Service│ │Assem│ │Construct│ │Purchase│ │Purchase│
       │  Order   │ │ Order │ │Order│ │  Order  │ │ Quote  │ │ Order  │
       └──────────┘ └───────┘ └─────┘ └─────────┘ └────────┘ └────────┘
    

    Without Document BOM (Direct Source Inheritance)

    ┌─────────────────────────────────────────────────────────────────────────────┐
    │                           ENGINEERING SOURCES                               │
    ├─────────────────┬─────────────────┬─────────────────┬───────────────────────┤
    │   Master BOM    │  Production BOM │     Routing     │     Assembly BOM      │
    └────────┬────────┴────────┬────────┴────────┬────────┴───────────┬───────────┘
             │                 │                 │                    │
             │                 │                 │                    │
             │    ┌────────────┴─────────────────┘                    │
             │    │  (Selected as direct BOM source)                  │
             │    ▼                                                   │
             │   ┌───────────────────────────┐                        │
             │   │   Project Budget Line     │◄───────────────────────┘
             │   │ (No merge - single source)│
             │   └─────────────┬─────────────┘
             │                 ▼
             │   ┌───────────────────────────┐
             │   │     Procurement Line      │
             │   └─────────────┬─────────────┘
             │                 │
             │       ┌─────────┼─────────┬───────────┬─────────┬──────────┐
             │       │         │         │           │         │          │
             │       ▼         ▼         ▼           ▼         ▼          ▼
             │  ┌──────────┐ ┌───────┐ ┌─────┐ ┌─────────┐ ┌────────┐ ┌────────┐
             │  │Production│ │Service│ │Assem│ │Construct│ │Purchase│ │Purchase│
             │  │  Order   │ │ Order │ │Order│ │  Order  │ │ Quote  │ │ Order  │
             │  └────┬─────┘ └───────┘ └───┬─┘ └─────┬───┘ └────────┘ └────────┘
             │       │                     │         │
             │       ▼                     ▼         ▼
             │  ┌──────────────┐    ┌──────────┐ ┌──────────────┐
             └─►│  Components  │    │ Assembly │ │ Construction │
                │ (from Prod.  │    │  Lines   │ │    Lines     │
                │  BOM lines)  │    │(from Asm │ │(from Master/ │
                ├──────────────┤    │BOM lines)│ │Prod BOM/     │
                │Routing Lines │    └──────────┘ │Routing/Item) │
                │(from Routing)│                 └──────────────┘
                └──────────────┘
    

    Key Rules

    This table describes the general rules for how Drawing Sets are transferred across procurement documents.

    Rule Description
    Additive Merging All merges are additive: existing drawings are retained, new valid drawings are appended.
    Duplicate Handling Duplicate drawings are automatically deleted during merge.
    Status Validation Invalid drawing statuses are skipped during transfer.
    No Auto-Update Adding new drawings to source BOMs after initial expansion does not automatically update existing Drawing Sets.
    Manual Refresh To include new drawings, regenerate/expand again or manually edit the Drawing Set.

    Drawing Status Requirements

    For drawings to be transferred, they must have a status that allows:

    Usage Context Required Status Permission
    Purchase Lines Use in Purch. Line
    Not Released Production Orders Use in Not Released Prod. Order
    Released Production Orders Use in Released Prod. Order
    Construction Orders Use in Construction Order

    Note

    The applicable Production Order status depends on the Def. Prod. Order Status setting in the Projects Setup page.

    Special Cases

    In some cases, the transfer of drawings to the procurement documents deviates from the established rules. These are summarized in the following table.

    Scenario Behavior
    Assembly Orders No Document BOM merge occurs; header from Procurement, lines from Assembly BOM.
    Construction Line Item Replace Drawing Set refreshes from the new item when Type = Item.
    Manual Purchase Lines Takes Drawing Set from item if no project/document links exist.

    Feedback
    Submit feedback for this page .

    In This Article
    Back to top 2025 © COSMO CONSULT - Data protection - Imprint