Search Results for

    Show / Hide Table of Contents

    Auto Creation of Order Bundle

    Starting point:

    • FDC Resource is not logged in.
    • For the FDC Resource, the Auto Order Bundle Creation option is selected in the Concurrent Beginning field.

    Sequence:

    1. Start Operation A -> no Concurrent Beginning detected -> no Auto Order Bundle creation

      In Addition: Input Entry (Begin) created with reference to Operation A

    2. Start Operation B -> Concurrent Beginning detected -> Order Bundle created, including Operation A and B

      In Addition:

      1. Start Operation A and Input Entry 1 cancelled
      2. Start changed to Order Bundle with Start Time of Operation A.
      3. Input Entry (Begin) generated with reference to Order Bundle and Start Time of Input Entry 1
    3. Start Operation C -> Concurrent Beginning detected -> Operation C added to Order Bundle

      In Addition:

      1. Start Operation B and Input Entry 2 cancelled
      2. Start changed to Order Bundle with Start Time of Operation B.
      3. Input Entry (Begin) generated with reference to Order Bundle and Start Time of Input Entry 2 = Start Time of Input Entry 2
    4. Stop Operation A, B, or C -> Detection of Auto Order Bundle -> Stop of Order Bundle

      In Addition:

      1. Input Entry (End) generated with reference to Order Bundle
      2. FDC Entry generated with reference to Order Bundle
      3. Automatic Distribution occurs
      4. Times get distributed to Operations A, B, and C

    Feedback
    Submit feedback for this page .

    In This Article
    Back to top 2025 © COSMO CONSULT - Data protection - Imprint