Search Results for

    Show / Hide Table of Contents

    What's new in version 2.1

    Version 2.1.46945.0 of COSMO Project Construction adds the implementation of the catalog item management.

    Features and enhancements

    The following features are included in this release:

    Pull Request Description
    PR2817 Added QC Test List action to the Job Card
    PR2865 Added event publisher in PQM Integration
    PR2867 Increased decimal places for extra charges
    PR2884 Added Measurement Document multi-line lookup
    PR2895 Added Protect BoQ fields in Job Line Budget and BoQ Job Text
    PR2915 Enabled CodeCop for Parenthesis
    PR2924 Transfer Direct Unit Cost (LCY) from Placing Unit Job to BoQ Job
    PR3043 Added new Catalog Item Management

    Hotfixes

    This release fixes the following issues found in the previous version of the app:

    Pull Request Description
    PR2822 Expanded Placing Unit error message
    PR2954 Fixed Order Confirmation report
    PR3047 Fixed X31 with spaces in ordering number

    Removed or deprecated features

    Removed obsolete controls, objects and methods:

    Pull Request Description
    N/A N/A

    Technical specifications

    Details Version
    Requires Microsoft Base Application 17.2.0.0
    Requires COSMO Advanced Manufacturing Pack app 2.5.31181.0
    Requires COSMO Licensing app 1.2.0.34119
    Requires COSMO Project Construction - Integration Library app 2.0.0.0

    Feedback
    Submit feedback for this page .

    In This Article
    Back to top 2025 © COSMO CONSULT - Data protection - Imprint