Search Results for

    Show / Hide Table of Contents

    What's new in version 6.1

    Version 6.1.162485.0 of COSMO Project Construction adds the ability to create Construction Invoice Plans from sales/purchase orders as well as the ability to use resources and items for WBS assignments in Construction Invoice Plan Sales. Additionally, this version optimizes report layouts, increases performance for pages based on the "Job Line Budget" table, and adds Polish translations.

    This release adds other improvements and fixes issues found in the previous version of the app.

    Features and enhancements

    The following features are included in this release:

    Pull Request Description
    PR8739 Added upgrade to correctly fill in BoQ Pos. Node No. from Copy Calculation function (see PR8735).
    PR8787 Added BoQ Price Type field in Calculation Detail Lines.
    PR8804 Added ability to create a Construction Invoice Plan (Sales) from a Sales Order.
    PR8811 Added ability to create a Construction Invoice Plan (Purchase) from a Purchase Order.
    PR8915 Added Polish (pl-PL) translation.
    PR8943, PR8954 Optimized layout of the New Sales Invoice report.
    PR8963 Added the ability to use resources and items for WBS assignments in Construction Invoice Plan (Sales).
    PR9021 Increased performance for pages that are based on "Job Line Budget" table.
    PR9117 Optimized layout of the Sales Invoice Draft report.
    PR9119 Added Deduction Calculation filter at a single record.

    Bugfixes

    This release fixes the following issues found in the previous version of the app:

    Pull Request Description
    PR8599 Fixed the usage of Special Position types in components when entering the target price in the vernier adjustment.
    PR8718 Fixed the transfer of Vendor No. with Prices from Placing Jobs to BoQ Jobs for additional component lines.
    PR8735 Fixed issue where the Copy Calculation function incorrectly filled in the BoQ Pos. Node No.
    PR8740 Fixed missing default G/L account description in Sales and Purchase Documents.
    PR8929 Fixed issue where Vernier Adjustment did not consider Alternative and Optional positions.
    PR9123 Fixed error when using the Set BoQ Position No. function.

    Hotfixes

    The following hotfixes are included in this release:

    Hotfix No. Pull Request Description
    N/A N/A N/A

    Removed or deprecated features

    Removed obsolete controls, objects and methods:

    Pull Request Description
    PR8765 Removed obsolete FindSet parameter in various codeunits, pages, reports, and tables.

    Technical specifications

    Details Version
    Requires Microsoft Base Application 21.1.0.0
    Requires COSMO Advanced Manufacturing Pack 6.0.0.0
    Requires COSMO Project Construction - Integration Library 2.2.0.0
    Requires COSMO Licensing 1.3.0.0

    Feedback
    Submit feedback for this page .

    In This Article
    Back to top 2025 © COSMO CONSULT - Data protection - Imprint