Search Results for

    Show / Hide Table of Contents

    What's new in version 6.2

    Version 6.2.170985.0 of COSMO Project Construction is a Hotfix of the 6.2.168349.0 release.

    Version 6.2.168349.0 of COSMO Project Construction adds new Search & Replace Components function in various pages, optimizes the Calculation Statistics UI, and adds enhancements to the Sales Invoice report.

    This release adds other improvements and fixes issues found in the previous version of the app.

    Features and enhancements

    The following features are included in this release:

    Pull Request Description
    PR9233 Added Total Line in Cumulative Sales Invoice report to display Invoice/Payment History totals.
    PR9254 Fixed editability of table fields that were unused in pages.
    PR9268 Added actions for faster creation of BoQ elements.
    PR9277 Added consideration of Cash Discounts in Sales Invoice report for Cumulative Invoicing.
    PR9290 Optimized UI of Calculation Statistics page.
    PR9342 Added check on referenced records to prevent deletion of a used Execution Unit.
    PR9344 Added condition that prices are only transferred from Placing Units to BoQ Jobs if a BoQ Position No. is defined.
    PR9351 Revised function to register Measurement Documents.
    PR9354 Removed Job Line Dimension code in PaC Structure Lines page due to performance optimization.
    PR9364 Added the report selection usages for Project Construction to the standard enum object.
    PR9419 Added check on Job No. in Sales and Purchase Line before overwriting the G/L Account description.
    PR9456 Added new Search & Replace Components function in various pages.
    PR9466 Applied performance fixes from Advanced Manufacturing Pack 6.2.

    Bugfixes

    This release fixes the following issues found in the previous version of the app:

    Pull Request Description
    PR9197 Fixed issue in which the Sales Invoice report misleadingly displayed VAT amounts for Deductions.
    PR9217 Fixed issue when transferring values from CS Invoice Schedule to Invoice Line did not use Cumulative Value for Cumulative Invoicing.
    PR9274 Fixed disabled Planning and Processing action for BoQs in Job List subpage on Construction Project page.
    PR9291 Fixed "Copy to" function to only filter on selected records.
    PR9471 Fixed typos and additional spaces in labels.

    Hotfixes

    The following hotfixes are included in this release:

    Hotfix No. Pull Request Description
    6.2.170985.0 PR9528 Added locktable to Measurement registration process.
    PR9530 Added Drilldown to No. field in Job Procurement Planning page.
    PR9654 Fixed missing Unit Price field logic for Fast Calculation.

    Removed or deprecated features

    Removed obsolete controls, objects and methods:

    Pull Request Description
    N/A N/A

    Technical specifications

    Details Version
    Requires Microsoft Base Application 21.1.0.0
    Requires COSMO Advanced Manufacturing Pack 6.2.166517.0
    Requires COSMO Project Construction - Integration Library 2.2.0.0
    Requires COSMO Licensing 1.3.0.0

    Feedback
    Submit feedback for this page .

    In This Article
    Back to top 2025 © COSMO CONSULT - Data protection - Imprint