Search Results for

    Show / Hide Table of Contents

    What's new in version 7.0

    Version 7.0.184512.0 of COSMO Project Construction adds the new expand/collapse logic to Job Budget Lines pages as well as other improvements and performance optimizations to enhance your overall experience. Additionally, the minimum required version of the Base App was updated to BC 22.1.

    Features and enhancements

    The following features are included in this release:

    Pull Request Description
    PR10054 Added "Construction Charge" field to Sales Credit Memo Line table.
    PR10190 Added ability to suppress all subsequent confirmation messages in "Copy Calculation" action as well as added two progress windows.
    PR10205 Changed Resource ENUM usage to new AMP specifications.
    PR10235 Improved performance for local procedure "RollUpApportion" in "CCS PRCS BoQ Budget Calc." page.
    PR10506 Transferred new expand/collapse logic to Job Budget Line pages.
    PR10508 Added "Location for Sales" field to Job Card.
    PR10509 Switched order of GPS fields in Construction Project Card.

    Bugfixes

    This release fixes the following issues found in the previous version of the app:

    Pull Request Description
    N/A N/A

    Hotfixes

    The following hotfixes are included in this release:

    Hotfix No. Pull Request Description
    N/A N/A N/A

    Removed or deprecated features

    Removed obsolete controls, objects and methods:

    Pull Request Description
    N/A N/A

    Technical specifications

    Details Version
    Requires Microsoft Base Application 22.1.0.0
    Requires COSMO Advanced Manufacturing Pack 7.0.184322.0
    Requires COSMO Project Construction - Integration Library 2.2.0.0
    Requires COSMO Licensing 1.3.0.0

    Feedback
    Submit feedback for this page .

    In This Article
    Back to top 2025 © COSMO CONSULT - Data protection - Imprint