Search Results for

    Show / Hide Table of Contents

    Resource Planning Groups

    The Resource Shift Schedule Overview uses Resource Planning Groups to classify the resources.

    Resource Planning Groups are defined in the Res. Planning Group Code field in Work Centers and Machine Centers (Scheduling FastTab), and in Production Structure lines. Transferred codes from the work/machine centers can be modified in the Production Structure as needed.

    In the Planning Extension Setup page, the Empty Res. Planning Group Code field clusters all resources available in a certain shift without any assignment to a Resource Planning Group. Resources in this group have no Production Order operations assigned and, therefore, would be available for scheduling.

    See Also

    Res. Shift Schedule Overview


    Feedback
    Submit feedback for this page .

    In This Article
    Back to top 2025 © COSMO CONSULT - Data protection - Imprint