Search Results for

    Show / Hide Table of Contents

    What's new in version 9.4

    Version 9.4.309424.0 of COSMO Advanced Manufacturing Pack is a Hotfix of the 9.4.263087.0 release.

    Version 9.4.263087.0 of COSMO Advanced Manufacturing Pack is a Hotfix of the 9.4.261700.0 release.

    Version 9.4.261700.0 of COSMO Advanced Manufacturing Pack is a Hotfix of the 9.4.258863.0 release.

    Version 9.4.258863.0 of COSMO Advanced Manufacturing Pack is a Hotfix of the 9.4.254980.0 release.

    Version 9.4.254980.0 of COSMO Advanced Manufacturing Pack adds improvements and fixes issues to enhance your overall experience.

    Release Date: December 19, 2024

    Feature changes

    The new features as well as any enhancements and/or improvements to existing functionality that are included in this release are listed in the following table.

    Pull Request Description Module
    PR13895, PR14329 Added resource planning actions to Project Process page.
    Additionally, improved matrix pages as well as disabled ability to insert/delete records and added start/end dates to Project Process page.
    PR
    PR13919 Extended "Process planning lines" option in "Copy from" action on Project Budget Calculation to include predecessor and follower of project process lines. PR
    PR13965 Improved performance for the description indentation in Project List pages. PR
    PR13971 Added "Responsible (Technical)" and "Responsible (Prod.)" fields to Construction Inquiry and Construction Order.
    Added "Responsible (Technical) Filter" and "Responsible (Prod.) Filter" to Configure to Order Design Engineer role center.
    DM
    PR13975 Added sub-option "Resource Assignments" to the "Process planning lines" option in the "Copy from" action, which copies the resource assignments of the copied process planning lines. PR
    PR14072 Added Description 3, 4, 5 fields to Sales and Purchase subpages. DM
    PR14078 Added missing caption and tooltips to Select BOM confirmation dialog page. DM
    PR14090 Added status change check when certifying a Master BOM Version. DM
    PR14095 Added feature for blocking Variable/Attribute Types. DM
    PR14102 Changed input of Boolean variables in Checklist Lines and Checklist Line Templates to recognized true/false entries regionally and by various corresponding inputs. DM
    PR14127 Extended the Value Transfer function to transfer the calculated standard cost to an item's stockkeeping units. CA
    PR14129 Improved boolean input handling for language independence in QC Templates and QC Tests. PM
    PR14156 Prepared code for Business Central 25 compatibility. AMP, PR
    PR14167 Improved project procurement document creation. PR
    PR14214, PR14329 Added new Time Entry Recording that includes Work Time Recording, Daily Time Recording, and Time Entry Control. PR
    PR14238 Added product name to searchable pages in UI. PRPL
    PR14239 Added product name to searchable pages in UI. PR
    PR14241 Added product name to searchable pages in UI. PQM
    PR14242 Added product name to searchable pages in UI. PM
    PR14243 Added product name to searchable pages in UI. GX, PM
    PR14244 Added product name to searchable pages in UI. GX, PR
    PR14245 Added product name to searchable pages in UI. DM
    PR14246 Added product name to searchable pages in UI. CA
    PR14247 Added product name to searchable pages in UI. AMP
    PR14259 Added "Standard Task Code" field to the "Transfer Changes to Prod. Order" action. DM
    PR14270 Added a confirmation dialog when changing the item number (or variant code) in the Sales Line when a Checklist already exists for the line. DM
    PR14276, PR14341 Added subcontracting for Assembly Orders. DM
    PR14282, PR14329 Renamed "Job" to "Project" in label to align with the new Business Central terminology. CA, GX, PR
    PR14288 Improved performance and usability of Project Controlling field calculations. PR
    PR14301 Added Project Comment Lines FactBox for Procurement Comments to Project Procurement Planning pages. PR
    PR14302 Added FactBoxes to Project Processing Invoicing page. PR
    PR14300 Added "Order Confirmation Required" field to Vendor Card. PR
    PR14338 Unified calls of Job Line Budget views (Budget Calculation, Planning and Processing, Sales, WIP, and Rolling Calculation) to improve consistency and behavior based on from where the view is opened. PR
    PR14340 Added setup configuration to save user preferences for grid settings, including size, style, scale, zoom, columns, and order to Graphical Project Planning and Graphical Project Resource Planning views. GXPR
    PR14344 Added progress line for Job Scheduling on Graphical Project Planning and Graphical Project Resource Planning views. GXPR
    PR14345 Added actions in Project Role Centers to open filtered versions of GXPR views. GXPR

    Technical changes

    The technical changes (such as new integration events, permission set changes, etc.) that are included in this release are listed in the following table.

    Pull Request Description Module
    PR13890, PR13944 Refactored Job Comment Type to extensible Enum. PR
    PR13901 Add extensibility option CalculationScheduleNo to "CCS CA Calculation Header" table. CA
    PR13935 Added new integration event to "CCS PQM Management" codeunit. PQM
    PR13956 Added new integration event to "CCS PM Item Tracking Mgt." codeunit. PM
    PR13961 Added new integration events in "CCS CA Calculation Mgt." codeunit. CA
    PR13969 Implemented Confirm Management in the "CCS CA Calculation Mgt." codeunit to enhance the maintainability and scalability of the code by utilizing a centralized confirmation handling mechanism. CA
    PR13970 Implemented extensible field change check for the "CCS CA Calculation Mgt." table to ensure that the procedure can be used to check changes for any field within the calculation header. CA
    PR13974 Improved performance of view authorization checks for calculation lines in the "CCS CA Calculation Mgt." codeunit. CA
    PR13977 Set workdate as starting date for Sales Calculations without Order Date in the "CCS CA Calculation Mgt." codeunit. CA
    PR13987 Added new integration events in "CCS CA Calculation Mgt." codeunit. CA
    PR14001 Updated folder structure for Process Manufacturing namespaces.
    Process Manufacturing (PM) and Planning Extension (PX) are no longer treated separately within the namespaces.
    PM
    PR14001, PR14329, PR14355 Updated/changed "CCS AMP ALL" permission set. DM, PM, PR
    PR14046 Added requested integration events in "CCS AMP Prod. Order Line" table extension. DM
    PR14051 Added new integration events to multiple codeunits. PM
    PR14158 Made variable in the "CCS AMP Item Tracking Lines" page extension available globally for extensibility. PM
    PR14167 Added new integration event to "CCS PR Job Procurement Mgt." codeunit. PR
    PR14200 Refactored "Manual Pricing" field from Option to Enum. PR
    PR14208 Changed "Procurement Channel" field from Data Type to Enum in "Resource" and "General Component" tables. PR
    PR14285 Moved "CCS DM Change2" table to correct folder for namespace update. DM
    PR14307 Added new integration event to "CCS DM Document BOM" table. DM
    PR14308 Added new integration events to "CCS DM Document BOM" table. DM
    PR14311 Added new integration events to "CCS AMP Sales Line" table extension. DM
    PR14325 Added integration event to "CCS PX Maint.-/Setup Job Mgt." codeunit. PM
    PR14330 Added new procedure to set T39_HideDateCheckMessage in "CCS PR Standard Event Subscr." codeunit. PR
    PR14346 Added new integration event in "CCS PR Job Sales Mgt." codeunit. PR

    Bugfixes

    The issues from the previous version of the app that were fixed in this release are listed in the following table.

    Pull Request Description Module
    PR13894 Fixed error that occurred when releasing a Project Procurement line of type "Service" if the "Procurement Cost Source" was "Standard" or "<empty>". PR
    PR13922 Fixed error that occurred in the Graphical Project Resource Planning view when manually assigning a resource to a Process Line. GXPR
    PR13972 Fixed overflow error that occurred when the difference between minimum and maximum lot size values of a Production Structure variant results in a number with decimal places. PM
    PR14005 Changed calculation of requested receipt date when creating a purchase order from project procurement. PR
    PR14022 Fixed WBS reset on invalid user entry and further unified the code base for WBS calculation. PR
    PR14053 Fixed calculation of Unit Cost for subcontracting Work Center in CTO BOMs if BOM Level > 1. DM
    PR14069 Fixed issue in which the "Special Position" and "Special Position No." fields were not reset when copying a project budget line. PR
    PR14122 Fixed issue in which Purchase Quotes were not created for Document BOM and Construction Line with Status = Open. DM
    PR14145 Fixed error that could occur when posting a subcontracting purchase order in which the subcontracting Work Center uses an External Service Item. DM
    PR14147 Fixed dimension restoration after changing "No." field in "Purchase Line" table. PR
    PR14185 Fixed calculation of "Qty. Unit of Measure" field in subcontracting Purchase Order and Warehouse Receipts lines. DM
    PR14233 Fixed issue of creating Enclosure Transfer Order Lines using components from other Production Order Lines. DM
    PR14259 Fixed issue in which the "Standard Task Code" field was not transferred from the Document BOM and Construction Order when creating a Production Order. DM
    PR14280 Fixed missing lookup of WBS field in Service Order. PR
    PR14297 Fixed issues in PQM action "Transfer Purchase Conditions". PQM
    PR14315 Fixed error that could occur when a Checklist opens automatically when inserting the Quantity in a Sales Line and the "Open Immediately" field is activated in combination with "Reserve" = Always. DM
    PR14343 Fixed error that could occur when using certain settings in the "Copy from" action in Job Budget Calculation if destination is an empty job. PR
    PR14354, PR14363 Fixed issues in "Planning Processes" page with missing filters. PR

    Hotfixes

    The hotfixes for this release are listed in the following table.

    Hotfix No. Release Date Pull Request Description Module
    9.4.309424.0 2025-10-21 PR17044 Added new integration event to "CCS PR Job Invoicing Mgt." codeunit. PR
    PR17272 Fixed an error in the Production Journal that occurred when changing the Posting Quantity field with item tracking lines present and the "Use Posting Qty. and Scrap Defaults in Prod. Journal" setting enabled. Added validation logic to prevent updates for production order components with "Calculation Formula" = "Fixed Quantity", ensuring only relevant lines are updated and users are notified when item tracking lines prevent updates. PM
    9.4.263087.0 2025-02-07 PR14685 Added requested integration events in "CCS DM Construction Line Mgt." codeunit which already exist in "CCS DM Document BOM Mgt." codeunit. DM
    9.4.261700.0 2025-01-30 PR14402 Fixed delivery of Sales Order lines with subcontracted Assembly to Order. DM
    PR14603 Fixed calculation of Quantity, Qty. Handled, and Qty. Outstanding fields in partially registered picks with delivery tolerance. PM
    9.4.258863.0 2025-01-14 PR14385 Fixed error the occurred when creating an item variant via a web service session. PM
    PR14393 Fixed issue in which the Quantity per and Expected Quantity fields in production order components were not calculated correctly when a production BOM with a line type Production BOM was used, which was linked via a Routing Link Code to a production order routing line with Fixed Scrap Quantity. PM
    PR14424 Fixed component unit cost calculation in Detail Calc. Standard Cost page.
    Renamed Detail Calc. Standard cost page actions to Detail Calc. Production Std. Cost and added tooltips.
    PM
    PM14431 Added requested integration event to "CCS DM Enclose Management" codeunit. DM
    PR14437 Fixed display of current location in Equipment Location FactBox. PR
    PR14460 Added integration event to "CCS DM Subscribers" codeunit. DM
    PR14467 Added Capacity Unit of Measure "Second" to CalcBaseUnitTime procedure, which is used in the "CCS CA Calculation Mgt." codeunit. DM
    PR14471 Inhibited unnecessary Prod. BOM Status check when creating Prod. Order from Document BOM or Construction Order. DM
    PR14472 Fixed displayed value of the Substitute Exist field in the Requisition Worksheets page. DM
    PR14493 Fixed missing transfer of item default dimensions when using Trading Unit Item Adjustment. PM

    Removed or deprecated features

    The obsolete controls, objects, and methods that were removed or deprecated in this release are listed in the following table.

    Pull Request Type Description Replaced by Module
    PR13968 Code removal Removed unusable PQM Color procedures. - PQM

    Technical specifications

    The required minimum version of Business Central, COSMO Licensing, and any dependent apps are listed in the following table.

    Details Version
    Requires Microsoft Base Application 24.0.0.0
    Requires COSMO Licensing 2.6.0.0
    Requires COSMO Graphical Extension 6.0.0.0

    Feedback
    Submit feedback for this page .

    In This Article
    Back to top 2025 © COSMO CONSULT - Data protection - Imprint