Search Results for

    Show / Hide Table of Contents

    Create Construction Inquiry for Project Budget Line

    The construction inquiry is almost identical to the construction order except that the components of the construction inquiry do not initiate demand.

    In the Project Budget Calculation page, a construction inquiry can be created either for the entire Document BOM or only for the assembly unit, based on the selected Document BOM line.

    After creating the Document BOM for the budget line, open the Document BOM and then create the construction inquiry for the:

    • entire document BOM by choosing either the:
      • Create Construction Inquiry (whole BOM) action on the Actions menu.
      • ellipsis button in the Constr. Inquiry Status field at the bottom of the page
    • assembly unit by:
      • selecting the assembly unit line and then choosing either the:
        • Create Construction Inquiry action on the Related menu.
        • empty Constr. Inquiry Status field on the line (must be shown using the Personalize function).

    Feedback
    Submit feedback for this page .

    In This Article
    Back to top 2025 © COSMO CONSULT - Data protection - Imprint