Search Results for

    Show / Hide Table of Contents

    Exchange Production BOM Item in Production Structure

    The Exchange Production BOM & Structure Item function in COSMO Process Manufacturing uses the same logic of the standard Exchange Production BOM Item function, which searches the Production BOMs for an item and then exchanges that item for a different one. However, if the Production BOM line was created by a Production Structure line, the Exchange Production BOM & Structure Item function exchanges the item in the Production Structure line, not in the Production BOM line. The Production BOM line will be changed when the Production Structure is re-certified.

    The Exchange Production BOM & Structure Item function is accessible using the Tell Me feature.


    Feedback
    Submit feedback for this page .

    In This Article
    Back to top 2025 © COSMO CONSULT - Data protection - Imprint