Search Results for

    Show / Hide Table of Contents

    What's new in version 10.1

    Version 10.1.310976.0 of COSMO Advanced Manufacturing Pack is a Hotfix of the 10.1.268815.0 release.

    Version 10.1.268815.0 of COSMO Advanced Manufacturing Pack is a Hotfix of the 10.1.265163.0 release.

    Version 10.1.265163.0 of COSMO Advanced Manufacturing Pack adds improvements and fixes issues to enhance your overall experience.

    Release Date: February 20, 2025

    Note

    Tooltips and links have been added to the Module column to indicate the module name as well as links to the content. The links will either open new/changed topics or base content if changes do not exist, which could happen because content is in progress or the change doesn't affect content. The links will be updated as content is released.

    Feature changes

    The new features as well as any enhancements and/or improvements to existing functionality that are included in this release are listed in the following table.

    Pull Request Description Module
    PR14677 Included newly inserted Construction Order Lines marked as Separate Prod. Orders to the "Transfer Changes to Prod. Order" feature. DM
    PR14688 Added column for items planned in the Production Order Components to the Matrix per Version page. DM
    PR14691 Added ability to create a Construction Inquiry for a whole Document BOM that is linked to a Project Budget Calculation line. DM, PR
    PR14693 Added feature to select "Budget" and "Budget Costs" checkboxes in Project Budget Calculation lines via the Expand Sales Order function. PR
    PR14695 Added drill-downs to quantity columns in Matrix by Version page. DM
    PR14700 Added prototype calculation to Sales Lines for items without a Master BOM. DM
    PR14706 Extended the Item Search & Replace function to include the search, change, and replacement of Item Variants. DM
    PR14722 Changed tooltip wording from "Job Ledger Entry" to "Project Ledger Entry" to conform to the standard wording. PR
    PR14766 Added update functionality for Construction Orders from master data for supporting growing BOMs in a ongoing development/production process. DM
    PR14791 Renamed "Proc. Currency Factor" field caption to "Purch. Currency Factor" in multiple tables. PR
    PR14795 Added context menu link for unplanned Project Line Processes to open Graphical Project Resource Planning view from Graphical Project Planning view. GX, PR
    PR14800 Added AMP specific content to Service Order/Quote Archive with restore functionality. CA, DM, PR
    PR14815 Added feature to manage Pre-Orders in Construction Order. DM
    PR14824, PR14834 Added "Batch Item Standard Cost Calculation" feature that enables automated, filtered batch updates of item and stockkeeping unit standard costs. CA
    PR14853 Added ability to delete Master BOMs with Status = Closed. DM

    Technical changes

    The technical changes (such as new integration events, permission set changes, etc.) that are included in this release are listed in the following table.

    Pull Request Description Module
    PR14685 Added requested integration events in "CCS DM Construction Line Mgt." codeunit which already exist in "CCS DM Document BOM Mgt." codeunit. DM
    PR14695, PR14766, PR14824 Updated/changed "CCS AMP ALL" permission set. DM
    PR14712 Added integration event to "CCS PR Posting Mgt." codeunit. PR
    PR14713 Replaced StyleExpression labels with new PageStyle Enums. CA, DM, PM
    PR14765 Added integration events to "Document BOM Mgt." and "Construction Line Mgt." codeunits in LineMoveRight and LineMoveLeft procedures. DM
    PR14779 Added integration event to "CCS PR Job Line Budget" codeunit. PR
    PR14781 Added integration event to "CCS PX Sequence Planning" codeunit. PM
    PR14799, PR14801, PR14803 Added integration events to "CCS DM Document BOM" and "CCS DM Construction Line" tables. DM
    PR14813 Added new overload for NewVersion procedure to "CCS PR Job Version Mgt." codeunit. PR
    PR14826 Added integration event to "CCS PM ProdStruct Ingred. Mgt." codeunit. PM

    Bugfixes

    The issues from the previous version of the app that were fixed in this release are listed in the following table.

    Pull Request Description Module
    PR14777 Fixed issue in which the Recipe No. was incremented incorrectly when assigned via Assist Edit in the Production BOM page. PR
    PR14789 Fixed endless loop in Project Card page if the COSMO Project application area was deactivated. PR
    PR14828 Fixed error in which a Prototype item could copy the Document BOM from an archived BOM, including Comments, Tools, Quality Measure or Personnnel. DM
    PR14829 Fixed error that occurred when copying and opening LookUp Table Filters in Checklist Line Template Versions as well as fixed the sorting of archived Construction Order Lines. DM
    PR14842 Fixed missing Lookup Table Filters in Sub-Checklists. DM
    PR14884 Fixed error that occurred when calculating the regenerative plan in the Planning Worksheet for an item with parallel routing and work center production rate. PM

    Hotfixes

    The hotfixes for this release are listed in the following table.

    Hotfix No. Release Date Pull Request Description Module
    10.1.310976.0 2025-10-30 PR14968 Use SecretText on OAuth 2.0 authentication on Graphical Construction and Master BOM Structure views. PR
    10.1.268815.0 2025-03-13 PR14802 Fixed missing conversion to local currency in Project Budget Calculation. PR
    PR14960 Improved synchronization between enclosed Prod. Order Components and Transfer Lines. DM
    PR14998 Added additional parameters to integration event OnCreateTransferOnBeforeCreateTransferOrderHeader() in "CCS DM Enclose Management" codeunit. DM
    PR15002 Fixed error that occurred when adding a new line to a Purchase Quote if the Project No. and WBS fields were populated in the line above. PR
    PR15013 Fixed issue in which the Variant Code was reset to empty for Prod. Order Components when replacing Items with Variant Codes via the Item Search & Replace. DM
    PR15020 Added integration event to "CCS PM ProdStruct Ingred. Mgt." codeunit. PM
    PR15021 Added integration event to "CCS PM Comb. Prod. Order Mgt." codeunit. PM
    PR15036 Fixed issue in which the wrong Item Unit of Measure Code was set in the Production Order Line when validating the Production Structure number manually. PM
    PR15042 Fixed issue in which the leading zeros in the Trading Unit No. were missing when a new number was retrieved. PM
    PR15051 Fixed issue in which the standard routing link of a work center was not transferred correctly when a work center was entered manually in a Prod. Order Routing line. PM
    PR15055 Replaced current usage of confirms in "CCS PM Deliv. Tol. Services" codeunit with the flexible Confirm Management system. PM
    PR15056 Added integration event to "CCS PM Deliv. Tol. Services" codeunit. PM
    PR15072 Fixed issue in which deleting General Components did not delete the connected Default Dimensions. PR
    PR15082 Fixed drilldown filter for Process Release field in Project Planning and Processing page. PR
    PR15100 Fixed issue in which copying a document from a sales archive created new numbers for Document BOM and Checklist if a reopened Advance Payment Invoice existed.
    NOTE: Relevant only when the COSMO Advance Payment app is also installed.
    DM

    Removed or deprecated features

    The obsolete controls, objects, and methods that were removed or deprecated in this release are listed in the following table.

    Pull Request Type Description Replaced by Module
    PR14694, PR14832 Obsoleted field/procedure removal Removed obsoleted fields and procedures prior to version 8.0. - PR
    PR14757 Field obsoletion Obsoleted "Procurement Info Line" field in multiple tables and pages. - PR

    Technical specifications

    The required minimum version of Business Central, COSMO Licensing, and any dependent apps are listed in the following table.

    Details Version
    Requires Microsoft Base Application 25.2.0.0
    Requires COSMO Licensing 2.7.0.0
    Requires COSMO Graphical Extension 6.1.0.0

    Feedback
    Submit feedback for this page .

    In This Article
    Back to top 2025 © COSMO CONSULT - Data protection - Imprint