Search Results for

    Show / Hide Table of Contents

    Resource Scheduling in Production Structures

    Setting up resource scheduling in Production Structures is similar to the routings, except the skill sets can be added directly in the production structure lines. When added to production structure lines, skill sets attached to the work centers are attached to the production structure lines. These skills can be modified as needed in the lines.

    Note

    Skill Sets can be assigned only to production structure lines with Type = Work Center.

    When the routing is created from the certified production structure, the skill sets are transferred.

    Production orders created from the production structure include all relevant resource scheduling information.

    Note

    Run the Refresh Production Order function to activate the automatic resource scheduling for production orders created from the Production Structure.

    See Also

    Skill Sets
    Production Structures


    Feedback
    Submit feedback for this page .

    In This Article
    Back to top 2025 © COSMO CONSULT - Data protection - Imprint