Search Results for

    Show / Hide Table of Contents

    What's new in version 4.0

    Version 4.0.99778.0 of COSMO Advanced Manufacturing Pack adds the Manufacturing Date field to Lot- and Serial No. Information pages in COSMO Process Manufacturing, adds the Formula Add. Charge/Price Red. field to Checklists in COSMO Discrete Manufacturing, adds the Enclosure function between CTO subcontracting in COSMO Discrete Manufacturing and production structures in COSMO Process Manufacturing, and adds reservation for production orders against inventory requests as well as Job Inventory Requests to Item Availability by Event pages in COSMO Project Manufacturing.

    Features and enhancements

    The following features are included in this release:

    Pull Request Description Module
    PR4184 Added reservation for production orders against inventory requests. PR
    PR4797 Changed captions to clarify translations. PR
    PR4843 Enabled usage of Dyn. Function GETVALUE in Arithm. Formulas in Calculations. DM
    PR4852 Redesigned subscriber CU5813_OnBeforeCheckPurchRcptLine to use standard code for G/L Accounts. PR
    PR4874 Suppressed message of unsupported automatic reservation of Construction Orders. DM
    PR4879 Added event in PQM Placing Matrix. PQM
    PR4888, PR4949 Updated translations. AMP
    PR4893 Added Enclosure Drop Shipment and Enclosure function of CTO subcontracting to production structures line. DM, PM
    PR4902, PR5274 Added requested publishers. AMP, CA, PM, PR
    PR4947 Changed rounding of calculation values. CA, PM
    PR5005 Increased app to 4.0 and application version to 19.0.0.0. AMP
    PR5007, PR5197, PR5251 Changed the Type field in Production Structure line from Option to ENUM. PM
    PR5100 Added the Formula Add. Charge/Price Red. field to Checklist template and line. DM
    PR5108 Prevented update of Calculation Price Base when transferring calculated Unit Price from Checklist to Sales Line. DM
    PR5145 Added Manufacturing Date field to Serial and Lot No. Information pages. PM
    PR5182 Made vars visible for Document BOM page extensions. DM
    PR5189 Replaced placeholder #var# in Sales Line Description fields when requesting Document BOM and added new publisher. DM
    PR5192 Added Job Inventory Requests to Item Availability by Event page. PR
    PR5245, PR5250 Added warning when deleting Sales Line if Production Order already exists. DM
    PR5265, PR5270 Added copy and paste feature for Production Structure lines. PM
    PR5272 Utilized enhanced email capabilities for Send Note on Prod. Order Delay feature. PM

    Bugfixes

    This release fixes the following issues found in the previous version of the app:

    Pull Request Description Module
    PR4819 Corrected Quantity creating Production Order from Document BOM/Construction Order using Line Type = Production BOM. DM
    PR4868 Fixed issue with Sequence Planning checkmark removal in Production Structure line. PR
    PR4870 Fixed update of setup time in work center production rates. PX
    PR4901 Added "Calculation Description" as column name in Concurrent Calculation Matrix. CA
    PR4937 Fixed currency conversion for resource prices. PR
    PR4955 Fixed error when finishing production order with tools. PM
    PR4961 Fixed wrong DE translation of new calculation rounding. AMP
    PR4987 Fixed wrong run time suggestion in Production Journal. PM
    PR4993 Fixed usage of work center production rates in calculations without Production Structure. CA
    PR5009 Fixed job line budget sales price calculation for resources. PR
    PR5109 Added COSMO Project functionality and fields to the new MS Time Sheet function. PR
    PR5131 Fixed error when issuing multiple pieces of equipment. PR
    PR5137 Fixed calculation of Exp. Quantity when using Quantity Per in combination with Rounding Precision. DM
    PR5129 Replaced event publisher OnBeforeCalculationDetailLineModifyOnCalcJobVersion. CA, PR
    PR5166 Fixed Equipment Entries action on Resource Card. PR
    PR5191 Updated the call to the Roll Up Standard Cost report in the Standard Cost Worksheet. AMP
    PR5193 Fixed quantity calculation in warehouse pick with delivery tolerance. PM
    PR5195 Fixed typos in captions and tooltips. AMP
    PR5215 Prevented multiple binding of same subscription codeunit of GXPX and GXPR. AMP
    PR5216 Fixed creation of Service Orders from procurement planning. PR
    PR5217 Disabled manual insertion of Job Orders. PR
    PR5229 Fixed message after creating Prod. Orders from Sales Line with existing Document BOM. DM, PM
    PR5267 Fixed drilldown in Current Version field on Job Card. PR
    PR5275 Fixed calculation of Inventory Requests on Item Available per Location page. PR
    PR5278 Removed check for Procurement No. in Purchase Order Postings for Comment Lines. PR

    Hotfixes

    The following hotfixes are included in this release:

    Hotfix No. Pull Request Description Module
    N/A N/A N/A N/A

    Removed or deprecated features

    Removed obsolete controls, objects, and methods:

    Pull Request Description Module
    N/A N/A N/A

    Technical specifications

    Details Version
    Requires Microsoft Base Application 19.0.0.0
    Requires COSMO Licensing 1.1.0.0
    Requires COSMO Graphical Extension 2.11.0.0

    Feedback
    Submit feedback for this page .

    In This Article
    Back to top 2025 © COSMO CONSULT - Data protection - Imprint