Search Results for

    Show / Hide Table of Contents

    What's new in version 6.3

    Version 6.3.291769.0 of COSMO Advanced Manufacturing Pack is a Hotfix of the 6.3.203210.0 release.

    Version 6.3.203210.0 of COSMO Advanced Manufacturing Pack is a Hotfix of the 6.3.196101.0 release.

    Version 6.3.196101.0 of COSMO Advanced Manufacturing Pack is a Hotfix of the 6.3.194813.0 release.

    Version 6.3.194813.0 of COSMO Advanced Manufacturing Pack is a Hotfix of the 6.3.192787.0 release.

    Version 6.3.192787.0 of COSMO Advanced Manufacturing Pack is a Hotfix of the 6.3.189334.0 release.

    Version 6.3.189334.0 of COSMO Advanced Manufacturing Pack is a Hotfix of the 6.3.187473.0 release.

    Version 6.3.187473.0 of COSMO Advanced Manufacturing Pack is a Hotfix of the 6.3.186901.0 release.

    Version 6.3.186901.0 of COSMO Advanced Manufacturing Pack is a Hotfix of the 6.3.178349.0 release.

    Version 6.3.178349.0 of COSMO Advanced Manufacturing Pack is a Hotfix of the 6.3.177121.0 release.

    Version 6.3.177121.0 of COSMO Advanced Manufacturing Pack is a Hotfix of the 6.3.176237.0 release.

    Version 6.3.176237.0 of COSMO Advanced Manufacturing Pack is a Hotfix of the 6.3.175902.0 release.

    Version 6.3.175902.0 of COSMO Advanced Manufacturing Pack is a Hotfix of the 6.3.175733.0 release.

    Version 6.3.175733.0 of COSMO Advanced Manufacturing Pack is a Hotfix of the 6.3.174654.0 release.

    Version 6.3.174654.0 of COSMO Advanced Manufacturing Pack is a Hotfix of the 6.3.173559.0 release.

    Version 6.3.173559.0 of COSMO Advanced Manufacturing Pack implements same Scrap % logic used in Routings and Production BOMs into CTO BOMs in COSMO Discrete Manufacturing, skips non-inventory items for component availability check in Prod. Order lines in COSMO Process Manufacturing, adds the new BC Calculation Formula option "Fixed Quantity" to BOMs in COSMO Discrete Manufacturing and COSMO Process Manufacturing, and improves the Search & Replace function as well as other processes in COSMO Project Manufacturing.

    This release adds other improvements and fixes issues found in the previous version of the app.

    Features and enhancements

    The following features are included in this release:

    Pull Request Description Module
    PR9266 Updated editability of AMP table fields. AMP
    PR9428 Improved performance of "Update Calculation" in Job Budget Calculation. PR
    PR9448 Maintained procedure to transfer Job Journal Lines to Inventory Profiles. PR
    PR9454 Added use of Job-specific Payment Method Code when creating sales documents from a Job. PR
    PR9493 Added content menu to upcoming Graphical Construction Order Structure for Construction Orders. DM, GX
    PR9496 Optimized performance when creating Sales Quotes and Sales Orders. PR
    PR9499, PR9502, PR9650 Skipped non-inventory items for component availability check of Production Order lines. GX, PX
    PR9501 Increased performance for procedure AMPApplicationAreaActive. AMP
    PR9504 Added Person Responsible to Graphical Project Planning View. GX, PR
    PR9527 Added new publisher to "CCS PM Maintenance Order" table. PM
    PR9529 Added Finished Production Orders in calculation of Production Cost in Jobs. PR
    PR9545 Removed orphaned caption in Jobs Setup page. PR
    PR9546 Added missing keys to Job and Job Ledger Entry tables to improve performance. PR
    PR9553 Implemented the same Scrap % logic in CTO BOMs as in Routings and Production BOMs. DM
    PR9583 Added consideration of the "Use Location and Bin Defaults" field in Process Manufacturing Setup when creating Prod. Orders from Document BOM or Construction Order. DM
    PR9605 Adapted new BC Calculation Formula option "Fixed Quantity" to AMP BOMs. DM, PM
    PR9610 Added Inventory and Inventory Procurement Location fields to Procurement Lines pages. PR
    PR9626 Added GXPR tooltip integration events for Job, Job Line, and Assigned Resource. GX, PR
    PR9761 Added new event to "CCS PM Item Bottling Mgt." codeunit. PM
    PR9766, PR9823 Improved Search & Replace function. PR
    PR9796, PR9825, PR9826 Improved performance for various COSMO Project tasks. PR

    Bugfixes

    This release fixes the following issues found in the previous version of the app:

    Pull Request Description Module
    PR9557 Added reset in Search and Replace function after replacement. PR
    PR9696 Added Controller values to GXPX Process Controller. GX, PX
    PR9749 Fixed "Unit Cost (LCY)" calculation for job linked Sales Lines. PR
    PR9753 Fixed initialization of "WBS" field when changing "No." field in Job Budget Calculation. PR
    PR9772 Fixed "No Unit Price found" error on Job Procurement release. PR
    PR9787 Fixed wrong quantity in Sales Order line when using "Update Sales Order" action in "Job Budget Calculation" page. PR
    PR9790 Added Item "Last Direct Cost" for cost calculation in Job Line Budget. PR
    PR9802 Fixed transfer of Language Code from Job to Job Shipment. PR
    PR9811 Fix visibility of Equipment actions in Resource Card and List pages. PR

    Hotfixes

    The following hotfixes are included in this release:

    Hotfix No. Pull Request Description Module
    6.3.291769.0 PR16311 Skipped availability check for components without Remaining Quantity in Components Planning Pool. PM
    6.3.203210.0 PR11074 Fixed issue in which an error message occurred when entering the Posting Date in Job Time Entries with blank Job No. field. PR
    PR11142 Fixed issue in which filters were not reset in Job Procurement Planning page. PR
    PR11215 Fixed the conversion of Duration Quantity in Process Planning if the Fixed Process was set to Duration. PR
    PR11251 Fixed issue in which the Delayed Global Calculation field was not reset correctly after running the "Update Calculation" action. PR
    PR11330 Fixed error that occurred if multiple Job Budget Lines were added to an existing Sales Order between existing Sales Lines with the "Expand Sales Order" action. PR
    PR11428 Fixed issue in which the Job No. was lost in the Purchase Line when an item was selected through the Description field instead of the No. field. PR
    6.3.196101.0 PR11128 Fixed client timeout for Equipment Issuance. PR
    PR11132 Fixed issue in which the line discount was not transferred from the job source to the purchase line when using the classic price calculation. PR
    PR11145 Fixed transferred quantities from CTO BOMs to Prod. Order Components if using Unit of Measures that are not the Base Unit of Measure. DM
    PR11163 Fixed application area of Default QC Template field in Job Types Setup page. PR
    6.3.194813.0 PR11055 Fixed transferred quantities when creating multi-level production orders from Document BOM/Construction Order when scrap is used. DM
    PR11112 Fixed issue in which the calculation for routings with scrap was too high. DM
    6.3.192787.0 PR10861 Enhanced performance when opening Job Processing Shipment Plan page. PR
    PR10935 Added event to "CCS PR Job Copy" report. PR
    PR10954 Fixed issue with calculating prices in calculations with Price Source for Items = Purchase Pricing. CA
    PR10991 Fixed issue in which document totals were not updated after job-related fields were changed in purchase/sales quote/order/invoice lines. PR
    PR10996 Fixed purchase document lookups in Job Procurement Lines. PR
    6.3.189334.0 PR9884 Added reset of system filters when setting filter fields in Job Procurement Planning page.
    Added filter fields for Procurement Location Code and Job No.
    PR
    PR10555 Added IsHandled pattern to event in "CCS PR Standard Event Subscr." codeunit. PR
    PR10718 Added DM keys in Purchase- and Requisition Line tables to increase performance of "Purchase Exists" field in Construction- and Document BOM lines. DM
    PR10743 Fixed issue in which the Undo Purchase Receipt function did not correctly set the Provided Quantity field in Job Ledger Entries. PR
    6.3.187473.0 PR10707 Fixed formula calculation for assigned resources in Graphical Project Resource Planning view. GXPR
    6.3.186901.0 PR10199 Added new procedures to "CCS AMP Dialog Mgt." codeunit. AMP
    PR10564 Added new publisher to "CCS PM Single Instance" codeunit. PM
    PR10611 Fixed reset of "Manual Pricing" in "Update Calculation" action. PR
    PR10646 Fixed missing "Quantity Base" in Job Ledger Entries for purchase postings. PR
    PR10657 Fixed removal of negative Job Inventory Request Lines after posting. PR
    6.3.178349.0 PR10112 Optimized performance in "CCS PR Update Calculation" report. PR
    PR10114 Optimized performance by adding "Manual WBS Calculation" function that calculates the Job Budget Calculation when the page is opened and then only recalculates it when the new "Update WBS" action is run manually.
    Improved performance for the page search and the general WBS calculation.
    PR
    PR10117 Fixed issue with calculating the run time in Prod. Order Routing lines. PR
    PR10125 Expanded publisher in "CCS PM Process Manuf. Mgt." codeunit. PM
    PR10128 Improved "Update Calculation" action in Job Charges page to handle the selection of multiple charges. PR
    PR10131 Fixed Sales Quote quantity calculation in "Update Sales Quote" action. PR
    6.3.177121.0 PR10031 Added new event to "CCS PM Returnable Cont. Mgt." codeunit. PM
    PR10045 Removed check for empty lot- or serial numbers on Item Ledger Entry posting. PM
    PR10063 Made Item Tracking available for Warehouse Receipts of Subcontracting Purchase Orders. DM
    6.3.176237.0 PR9941 Fixed issue in which the list of Sales Orders that opened from the "Expand Sales Order" action in the Job Budget Calculation showed more than the ones connected to the selected source records. PR
    PR9998 Fixed error that prevented the creation of warehouse receipts with partial shipment. DM
    PR10006 Enabled the warning message for the "Qty. to Receive" field when shipping directly from a Purchase Order for Subcontracting Purchase Lines. DM
    6.3.175902.0 PR9982 Fixed issue when posting Purchase Invoices by adding permissions in "CCS PR Posting Mgt." codeunit. PR
    6.3.175733.0 PR9924 Added new event to "CCS PR Job Post Shipment" codeunit. PR
    PR9945 Fixed issue in which the Indirect Cost % was not applied in Purchasing Job Ledger Entries. PR
    PR9953 Fixed issue when opening the Item List in Extended View. PR
    PR9958 Fixed error that occurred in Job Line Budget after selecting component with a Global Default Dimension. PR
    PR9970 Fixed issue in which the Person Resource Filter was not working in Job List. PR
    6.3.174654.0 PR9885 Fixed creation of additional Job Procurement documents. PR
    PR9900 Fixed error on opening Production Journal for Production Order line with Subcontracting Work Center in the Prod. Order Routing line. PM
    PR9915 Added key in Sales Lines table to improve performance. PR

    Removed or deprecated features

    Removed obsolete controls, objects, and methods:

    Pull Request Description Module
    N/A N/A N/A

    Technical specifications

    Details Version
    Requires Microsoft Base Application 21.1.0.0
    Requires COSMO Licensing 1.2.0.0
    Requires COSMO Graphical Extension 3.5.0.0

    Feedback
    Submit feedback for this page .

    In This Article
    Back to top 2025 © COSMO CONSULT - Data protection - Imprint