Integration of COSMO Discrete Manufacturing
With COSMO Discrete Manufacturing functionality, the item master can become a Master BOM and Checklists can be assigned to it. Formulas, functions, and variables assigned in the Master BOM and Checklist work together to form a configuration, which is used to produce a BOM.
In COSMO Project Manufacturing, the checklists are processed in the Project Budget Calculation line by answering pre-defined questions. These answers are transferred to a Document BOM, which contains the selected configuration. Here, changes can be made prior to exploding the BOM in the Project Budget Calculation. Once exploded, budget information can be assigned and processed as usual in COSMO Project Manufacturing. The Document BOM can also be used to create Construction Orders and Production Orders in the Project Planning and Processing page.
This topic briefly describes the Master BOM, Checklist, and Document BOM in COSMO Discrete Manufacturing as well as the usage of each in the Project Budget Calculation, and the creation of Construction Inquiries from Document BOMs for project budget lines as well as Construction Orders in the Project Planning and Processing page. For detailed setup, configuration, and usage information, see the COSMO Discrete Manufacturing Help.
Master BOM
The Master BOM works according to the principle of the maximum BOM, which combines all valid options in a configuration. During the BOM calculation, the variables use formulas and rules to determine quantities, setup and run time, and if positions are valid. Once set up, the Master BOM is assigned directly to the item.
Checklist
The checklist is the interface between users and system. Since the checklist can provide its own logic, it ensures that only information examined and verified by the user is available for configuration. Once set up, the Checklist is assigned to the item.
Document BOM
As previously stated, the master BOM and checklist work together to form a configuration, which is used to produce the Document BOM.
The following table describes a sequence of tasks, with links to the topics that describe them.
| To | See |
|---|---|
| Learn how to define checklists for Project Budget Calculation lines as well as procurement and sales lines. | Checklists in Project Calculation, Procurement, and Sales Lines |
| Learn the methods for creating Document BOMs in the Project Budget Calculation line. | Create Document BOMs in Project Budget Calculation Line |
| Create a quotation using item pricing and currency handling as well as calculate price without providing a document BOM and calculation scheme. | Price Calculation with Checklist |
| Explode the Document BOM to the Project Budget Calculation line using the Expand BOM function or create Production Orders in the Project Planning and Processing page. | Process Document BOMs in Project Budget and Planning Lines |
| Transfer selected lines from a Document BOM directly into a Project Budget Calculation. | Transfer Document BOM Lines to Project Budget Calculation |
| Create a construction inquiry from a Document BOM related to a Project Budget Calculation line. | Create Construction Inquiry for Project Budget Line |
| Create a construction order from the Project Planning and Processing page. | Create Construction Orders from Project Planning and Processing Line |
| Transfer a prototype item/item variant created from a Master BOM in the Document BOM/Construction Order to the Project Budget Calculation. | Prototypes in Project Budget Calculation |