Project-wide Pre-Order Assignment
For project-related Construction Orders, a Project Procurement Line (Project Processing Procurement page) can be set up as a project-wide pre-order line by selecting its Pre-Order checkbox. Unlike the Construction-specific pre-order line described in Pre-Orders, a project-wide pre-order line is not tied to a single Construction Order; it can collect demand from Construction Lines across the whole project. The fields and messages described in this topic are available only if Activate Inventory Management is turned on in COSMO Project Setup.
The Pre-Order checkbox is only available for a Project Procurement Line that is an item line not yet linked to a source document, with Procurement Status = Planning and a Procurement Location Code set up as a project location. Clearing the checkbox is blocked while a Construction Line is still linked to the Project Procurement Line.
You can only select the Pre-Order checkbox for items with Replenishment System = Purchase. The replenishment system is determined for the item, variant code, and procurement location, taking a Stockkeeping Unit into account. For any other replenishment system, such as Prod. Order, Assembly, or Transfer, an error message opens. If you change the No. of a Project Procurement Line, the Pre-Order checkbox is cleared. If you change the Variant Code or Procurement Location Code of a pre-order line, the replenishment system is checked again.
Matching a Construction Line to a project-wide pre-order line requires the Construction Order's own Location Code (General FastTab) to be set up as a project location, and the Construction Order to already be linked to a Project Procurement Line. On the Construction Line itself, matching is attempted for every item component line for which Part Type is not Production. This applies regardless of the item's reordering policy, such as Order or Lot-for-Lot, and regardless of whether the Project Procurement checkbox is already selected. Matching takes place when you enter a line manually and when you explode a BOM.
When such a component matches a project-wide pre-order line by project, item number, and variant code, you are asked whether to link the component to it. Only pre-order lines with a Procurement Status of Planning or Released and some remaining quantity are considered. The location of the Construction Line is not a matching criterion; the message shows the Procurement Location Code of the pre-order line for information only. For a single Construction Line, a simple confirmation message offers Yes or No. For a bulk operation, such as requesting or comparing a Construction BOM, or transferring Document BOM lines, you instead get a dialog with the following entries:
- Choose Yes to link only the current component.
- Choose Yes - only with the same item no. / variant code to also link, without asking again, any further component with the same item number and variant code that is assigned in the same operation.
- Choose Yes - all to link, without asking again, all further matching components assigned in the same operation, regardless of item number or variant code.
When a component is linked, the Project Procurement checkbox is selected on the Construction Line automatically, and the Location Code of the Construction Line is replaced by the Procurement Location Code of the project-wide pre-order line.
If you choose No, cancel the dialog in a bulk operation, cancel the quantity dialog described below, or no project-wide pre-order line is found, the Construction-specific pre-order assignment described in Pre-Orders applies instead.
If the quantity required by the component is higher than the quantity available on the project-wide pre-order line, a dialog asks you to choose Assign available quantity or Assign full required quantity. If you cancel this dialog while linking, the component is not linked to the project-wide pre-order line. The same dialog opens when you increase the quantity of a linked Construction Line beyond the available quantity of the pre-order line. If you cancel it there, the change is stopped with the message "The quantity change was canceled."
Once a Construction Line is linked to a project-wide pre-order line, its Project Procurement No. field shows the linked Project Procurement Line, and the linked quantity is reflected in the Assigned Pre-Order Qty. (Base) and Pre-Order fully Assigned fields of the Project Procurement Line (see Project Processing Procurement). The Pre-Order checkbox on the Construction Line becomes read-only (see the Pre-Order field in Construction Order).
Selecting the Pre-Order checkbox directly on a Construction Line for which Project Procurement is also selected creates a Construction-specific pre-order line instead. This is only possible for items with Replenishment System = Purchase; otherwise, an error message opens. If a project-wide pre-order line already exists for the same project, item, and variant code, a message informs you, shows the location of that line, and asks you to confirm that you still want to create the Construction-specific pre-order line. If you choose No, the Pre-Order checkbox is cleared again.
Feedback