Construction Order
In COSMO Discrete Manufacturing, a company's engineering or construction department can use the construction order for managing the BOM prior to manufacturing. Therefore, the construction order is considered the work order for the construction department. The design engineer has the option of modifying the document BOM created by sales or creating a new BOM. In this case, they have access to the checklist.
General FastTab
The fields on this FastTab are described in the following table.
Field | Description |
---|---|
No. | Unique identification of the construction order. |
Document Type | Type of document from which the construction order was generated. Possible document types are Quote and Order. The Project and Project Line document types are used when a construction order is generated from the industry-specific solution COSMO Project Manufacturing. This option is available when both products are used in an integrated system. The other document types are not used in the construction order. |
Document No. | Number of the initiating document. |
Line No. | The number of the document line from which the construction order was generated. |
Deleted Document Type / Deleted Document No. / Deleted Line No. | Identifies the type, number, and line number of a deleted document that was used to create the construction order. - If you delete a sales order line that has a construction order, you will be asked if you want to keep or archive/delete the construction order. If you choose to keep it, these fields will be populated with the type "Order", sales order number, and the number of the sales order line. - If you delete a service item worksheet line that has a construction inquiry, the construction inquiry will be decoupled and these fields will be populated with the type "Inquiry Service Line", service quote/order number, and the number of the service quote/order line. - If you delete a service item worksheet line that has a construction order, the construction order will be decoupled and these fields will be populated with the type "Service Line", service order number, and the number of the service order line. NOTE: The Deleted Document Type field is set to Quote in new documents. |
Item No. | The item number of the configurable item to which the construction order relates. |
Variant Code | Variant of the configurable item. |
Description | Defaults from the Description field of the configurable item. |
No. of Archived Versions | The number of archived versions of the construction order. The current version of the construction order is archived by choosing the Archive Construction action on the Actions menu. |
Unit of Measure | Quantity unit of the configurable item. |
Quantity | Quantity in the construction header. |
Reserved Quantity | When reservations have been generated for the overall construction order (for example from the date of promised delivery), the reserved quantity is displayed here. Choose the value to open the relevant reservation items for processing the reservations. |
Location Code | Storage location from the sales line. |
Checklist No. | Associated document checklist. |
Current Checklist Type | Indicates which checklist type will be used when creating the Construction BOM. The default value is the Checklist Type used with the checklist set up for Construction. The ellipsis button opens the Checklist of the specified type. For more information, see Create Empty Construction Orders/Copy Checklists from Sales to Construction. |
Shipment Date | The delivery date is either transferred from the sales order or can be calculated by choosing Schedule on the Process menu. |
Assembly Date | The assembly date is stored manually and is used only for information purposes. |
Production View | Indicates if the construction order is currently displayed in the production view. |
Production View Link | Identifies the production view code for the assembly unit that will be linked to the component. |
Department Code | The cost center on which the posting for the finished product is to be made in the cost calculation. The cost center defaults from the sales order or the project line from which the construction order was generated. |
Project Code | The cost unit on which the posting for the finished product is to be made in the cost calculation. The cost unit defaults from the sales order or the project line from which the construction order was generated. |
Released by | User ID of the user who has released the construction order. |
Released on | Date on which the construction order was released. |
Order Tracking Relevance | Internal application field used for calculations within requirements planning. |
Status | Indicates the status of the construction order. The options are Open, Released, Closed, and Work Preparation. |
Lines FastTab
The BOM in the Lines FastTab is always presented as a multi-level BOM. The fields and actions on the Lines FastTab are described in this section.
Fields
The fields on the Lines FastTab are described in the following table.
Field | Description |
---|---|
Level | Specifies the level of the BOM structure to which the line is assigned. The field cannot be edited. |
Position | Specifies the position number. This field is used to enter the drawing position numbers of an associated CAD or design drawing. |
Status | The current status of the BOM line. This field controls if the current line is included in supply planning (see Configure to Order Setup, General FastTab) or if a production order can be generated. The options are: - Open: Lines with this status are neither included in supply planning nor can a production order be generated. - Released: Lines with this status are included in supply planning if this is defined in the Configure to Order Setup page, and a production order can be generated. - Closed: This status must be set manually. - Work Preparation: Lines with this status are neither included in supply planning nor can a production order be generated. |
Type | Identifies the type of BOM line. The options are: - <Blank>: This option is used mainly to insert a comment in a manufacturing BOM line. - Account (G/L): Selection of a G/L account. - Item: This option enables an item from the item master to be entered as a BOM component. -- When an item has a master BOM itself, this is taken into consideration automatically and transferred to the construction BOM if the Part Type field is set to Production in the item master. When an item is entered manually, and if it has its own master BOM, this can be opened by choosing the Request BOM from Line action and then transferred to the construction BOM. -- If the Part Type field is set to Standard, the item is treated as in standard Microsoft Dynamics 365 Business Central. -- If the Part Type field is set to Purchase and the status of a Construction Line changes to Released, a new Variant Code gets inserted to the Variant Code field in the BOM line. If the Information Line checkbox is selected for the BOM type in the document BOM configuration, then the components from items with the Part Type field <> Standard or Purchase are also copied into the Construction Line. - Resource: This option enables a resource to be selected. The use of resources in the master BOM is relevant if the capacity and value of indirect areas (for example, construction) are also to be considered in the BOM. - Work Center: Selection of a work center for a series of operations. - Machine Center: Selection of a machine center for a series of operations. - Master BOM: Selection of a Master BOM. The components of this Master BOM will not be transferred as its own assembly group but will be copied directly into the current BOM level. - Production BOM: Selection of a production BOM. The components of this production BOM will not be transferred in as its own assembly group but will be copied directly into the current BOM level. The BOM will be exploded when the production order is created. Additionally, this type is used with the integration of COSMO Process Manufacturing (see Integration of COSMO Process Manufacturing). |
No. | Number of the relevant item, resource, work center, machine center, G/L account, or master BOM. |
Description | Item description from the Item Card. The item description is copied into the master BOM and can be changed as needed. |
Part Type | The part type of the item (does not apply for capacity items and resources). Defaults from the Item Card, Document BOM or Master BOM depending on how the Construction Order was created; can be changed as needed. If the Part Type = Standard on a parent item, and the Type, No., Exp. Quantity, Setup Time, Run Time fields are changed on a component line, or a component line is inserted or deleted, a message opens asking to change the Part Type to Production on the parent item(s). Additionally, the status of the component line cannot be released if the parent item is not released (for more information, see the Information Line field description). |
Exp. Quantity | Expected quantity of the position. If the Quantity per field is filled and/or in the Formula field, an option other than <Blank> is selected, the Exp. Quantity is based on the higher-level item and the quantity of the line. Additionally, the calculated value is based on the Rounding Precision in the Item Card. Therefore, when the Master BOM is requested in the Document BOM or Construction Line, the rounding precision is considered and cannot be changed if it does not match the specified rounding. For example, if an item on the line has a Rounding Precision set to 1, then you cannot change the Exp. Quantity from 3 to 3.2 or 3.252 but you can change it to 4. For work centers and machine centers, this field is used for calculating the time requirement according to the following formula: Time requirement = Tr + Te/Lot size * Exp. quantity |
Exp. Quantity Unit of Measure | Unit of measure of the quantity in the Exp. Quantity field. |
Setup Time | Setup time for the series of operations (only relevant with the Type field set to Work Center or Machine Center). |
Run Time | Processing time for the series of operations (only relevant with the Type field set to Work Center or Machine Center). |
Location Code | Defaults from the Main Location Code field on the Item Card. The setting can be changed as needed. |
Unit Cost (CC) | Cost price of the BOM line. The cost price is either defaulted from the master data or calculated from the configuration. |
Unit Amount (CC) | Cost amount of the BOM line. |
Freeze Unit Cost (CC) | If selected, prevents the cost from being overwritten manually or when running the Update Unit Cost & Price function. For more information, see General Price Handling and Update Unit Costs and Prices. |
Vendor No. | Setting from the Item Card that indicates the number of the vendor that should be used when purchasing from the Construction Order line. The vendor can be changed as needed, to indicate a different vendor from which the purchase quote/order or requisition line should be created. This vendor is used not only with the Purch. G/L Acc./Item function, but also in the planning process (Requisition Worksheet or Planning Worksheet). For more information, see Handling of Long Lead Time Items. |
Shipment Date | The date on which the component must be available. This date is the same as the Shipment Date on the General FastTab but can be recalculated with the Schedule function. Generally, it is dependent on the start date of the series of operations (see the Starting Date field). The value proposed by the system can be changed manually. |
Purchase Exists | Indicates whether there is a purchase quote/order or requisition line for a G/L account or component line (see Create Purchase Documents for G/L Accounts and Components and Components Planning Pool). |
Purchase Status | Indicates whether a purchase quote/order or requisition line for a G/L account or component has been created or posted (see Create Purchase Documents for G/L Accounts and Components). |
Starting Date | Calculated through the Schedule function. In the case of series of operations (Type field is set to Work Center, Machine Center, or Resource) the start date of the series of operations is entered here. The field can be changed manually. NOTE: For components of an assembly group that are linked to a routing line via a Routing Link Code, the Due Date is based on the Starting Date from the routing line. |
Ending Date | Calculated through the Schedule function. In the case of series of operations (Type field is set to Work Center, Machine Center, or Resource), the end date of the series of operations is entered here. The field can be changed manually. |
Due Date | Calculated through the Schedule function. In the case of items, the due date of the components is entered here. The field can be changed manually. |
Concurrent Capacities | Specifies the number of machines or persons that are working concurrently. The default value is "1" for all line types. However, if a different number is specified in the Machine Center Card, that value is used instead. For Work Centers and Machine Centers, this value is transferred to the Routings of the Production Order. This field can be changed manually. |
Long-Lead Item | Setting from the Item Card that identifies if the item needs a longer time to be delivered or produced. Choosing the value in this field opens the Items list, filtered on the item, regardless if the value is Yes or No. |
Entry No. | System-generated number of the BOM line. This number cannot be changed. |
Belongs to Entry No. | Specifies the higher-level BOM item to which the current line belongs. The field cannot be edited. |
Level Line No. | Sequential numbering of all BOM lines of a level. The field cannot be edited. |
Entry No. Representation | All lines are numbered sequentially by the system in order to present them in the correct order. The field cannot be edited. |
Description 2 – Description 5 | Item descriptions from the Item Card. The item descriptions are copied into the master BOM and can be changed as needed. |
Variant Code | Number of the item variant if a variant item is selected. |
Length | Identifies a length measurement. |
Width | Identifies a width measurement. |
Weight | Identifies a weight measurement. |
Depth | Identifies a depth measurement. |
Calculation Formula | Determines how to calculate the Quantity field. The options are: - <Blank>: Quantity = Quantity per - Length: Quantity = Length * Quantity per - Length * Width: Quantity = Length * Width * Quantity per - Length * Width * Depth: Quantity = Length * Width * Depth * Quantity per - Weight: Quantity = Weight * Quantity per - Fixed Quantity: Quantity = Quantity per (see Microsoft Documentation for more information). - Recipe: Used with the integration of COSMO Process Manufacturing (see Integration of COSMO Process Manufacturing). |
Quantity per | Identifies a quantity per value; functions the same as in standard Microsoft Dynamics 365 Business Central. |
Quantity | Quantity that is needed by the component to manufacture a unit of a higher-level item. The application updates this field automatically based on the Quantity per field and – and if the Calculation Formula field was filled in – the values in the Length, Width, Weight and/or Depth fields. |
Exp. Quantity (Base) | The quantity for the item in the line, expressed in base units. The application automatically completes this field. |
Quantity (Base, Parent) | The quantity for the item from the higher-level position in the BOM structure, expressed in base units. The application automatically completes this field. |
Spare Part | Defaults from the Item Card, Document BOM or Master BOM depending on how the Construction Order was created; can be changed as needed. |
Wear Part | Defaults from the Item Card, Document BOM or Master BOM depending on how the Construction Order was created; can be changed as needed. |
Separate Prod. Order | Defaults from the Item Card or from the master BOM and can be changed as needed but can only be selected if Part Type = Production. This field controls whether a separate production order is created for this line when a production order is generated. |
Sep. Prod. Order Exists | Indicates if a separate production order was created for the line via the Create Separate Prod. Order action. You cannot delete a construction order line if a separate production order exists unless the production order has been finished; otherwise, you must delete the separate production order before deleting the construction order line. |
Formula Quantity | Defaults from the master BOM. |
Setup Time Unit of Meas. Code | Time unit in which the setup time is planned (only relevant with the Type field set to Work Center or Machine Center). |
Run Time Unit of Meas. Code | Time unit in which the processing time is planned (only relevant with the Type field set to Work Center or Machine Center). |
Lot Size | Lot size in which the component is manufactured and to which the run time relates (only relevant when work centers or groups of work centers are used). |
Information Line | Corresponds to the Part Type field on the Item Card (see Config. to Order FastTab). If the item has the Part Type of Production, it is not relevant for requirements itself, but is relevant for its sub-items. In this case, the Information Line checkbox is selected. A line marked as an information line cannot be manually released if it is within a standard assembly (Part Type = Standard) and the level above is not released. Example - Level 1 item has Part Type = Standard. - Level 2 item has Part Type = Standard and the Information Line checkbox = selected. If Level 1 item status = Open, Closed, or Work Preparation, then the Level 2 item status can be set only to Open, Closed, or Work Preparation. If Level 1 item status = Released, the Level 2 item status can be set to Released. |
Sub BOM | Indicates whether the line has a substructure in the document BOM or construction order. Any master or manufacturing BOM that exists for the item is not displayed. |
Assembly Date | The assembly date is an additional date field used for information purposes. No functionality depends on this field. |
Department Code | When entering a document number, the program retrieves the Department Code from the sales header. |
Project Code | When entering a document number, the program retrieves the Project Code from the sales header. |
Dimension Set ID | Indicates the ID of any dimensions that have been entered for the construction BOM line. |
Source | Displays the BOM type of the master BOM from which the item is opened. |
Unit Price | Sales price of the BOM line. |
Line Discount % | The line discount percentage that is valid for the item on the line. |
Line Discount Amount | The amount of the line discount. |
Order Tracking Relevance | Internal application field that is used for calculations within requirements planning. |
Separate Delivery | Determines if the component is planned for a separate delivery (see Separate Delivery of Semi-Finished Goods). |
Starting Time / Ending Time / Due Time | These fields currently have no functionality. |
Schedule Manually | If selected, the line is not included in the Schedule function. |
Needed Time | Shows the sum of time based on the Needed Time field entries in the BOM Cap. Need page which were created when scheduling the BOM. Choosing the value in this field opens the BOM Cap. Need page that lists the entries. For example, if there are three entries in the BOM Cap. Need page with Needed Time = 5, 6, and 10, then the Needed Time field in the Construction BOM will show 21. |
Item/Variant Created | Specifies that this Item or Item Variant was created and changed by using the Create Item & BOMs action. |
Wait Time | Wait time for the series of operations (only relevant with the Type field set to Work Center or Machine Center). |
Move Time | Move time for the series of operations (only relevant with the Type field set to Work Center or Machine Center). |
Wait Time Unit of Meas. Code | Time unit in which the wait time is planned (only relevant with the Type field set to Work Center or Machine Center). |
Move Time Unit of Meas. Code | Time unit in which the move time is planned (only relevant with the Type field set to Work Center or Machine Center). |
Position 2 - Position 3 | Specifies the position number. These fields are used to enter the drawing position numbers of an associated CAD or design drawing. |
Production Lead Time | A lead time can be entered here. When a production order is generated from the construction order, the value entered here is taken over as the lead time for the component in the production order. |
Scrap % | A scrap percentage can be entered here. When a production order is generated from the construction order, the value entered here for the component is transferred to the Scrap % field of the production order. |
Send-Ahead Quantity | Specifies the output of the operation that must be completed before the next operation can be started. |
Standard Task Code | Indicates the Standard Task Code for the construction BOM line. |
Base Material | A base material can be entered here. If a base material is already assigned to the item card, it will default to the construction BOM when created. |
Production View Link | Identifies the production view code for the assembly unit that will be linked to the component. |
Belongs to Prod. View Link | Indicates which assembly unit this component is linked to and thus will become part of its configuration when viewing the construction order in the production view. |
Parallel Operation Code | Provides a simplified process for defining parallel routings. |
Operation No. / Next Operation No. / Previous Operation No. | Offers the same function as in standard Microsoft Dynamics 365 Business Central routings. In the Construction BOM, these fields only work if Type = Work Center or Machine Center. |
Vendor | Indicates the name of the vendor that should be used when purchasing from the Construction Order line. For more information, see Handling of Long Lead Time Items. |
Lead Time Calculation | Setting from the Item Card that identifies the amount of time needed for the item to be delivered or produced. For more information, see Handling of Long Lead Time Items. |
Unit Amount | Sales amount of the BOM line. |
Routing Link Code | Connects material with a series of operations. In COSMO Discrete Manufacturing, the Routing Link Code is used to assign material provided for an external manufacturing step. |
Enclosure | Indicates material provided for external processing. |
Enclosure Drop Shipment | Indicates material provided for external processing that must be drop shipped to the vendor. |
Qty. per Unit of Measure | Specification of the quantity in relation to the single value of the base unit. |
Reserved Quantity | Specification of the reserved quantity in relation to the component's base unit. |
Reserved Qty. (Base) | Specification of the reserved quantity in relation to the component's base unit. |
Reserve | Defines whether and how reservations can be made for the item; standard Microsoft Dynamics 365 Business Central functionality. |
Type Production Structure | Used with the integration of COSMO Process Manufacturing (see BOM Lines). |
Share % | Used with the integration of COSMO Process Manufacturing (see Calculate Quantity Per from Share of Recipe). |
Calculation Group Code | Groups items, work centers, machine centers, resources, or G/L accounts for calculation purposes (see Calculation Groups in Order-Related BOMs). |
Links | If selected, there is a drawing linked to this item. The linked files can be added, modified, or viewed in the standard Links FactBox. |
Reserved From | Indicates which line or entry the items are reserved from. |
Attributes (DM) | Displays all attributes that have been entered for the construction BOM line. |
Line Text exists | If you have the integration with Advanced Manufacturing Suite (AMS), this field is available. For more information, see Text in construction order line. |
Changed | Indicates if anything is changed in the Construction Order lines since the Construction Order page was opened. |
Line Menu
The actions on the Line menu of the Lines FastTab are described in the following table.
Action | Description |
---|---|
Move Left | Moves the marked position up one level in the BOM structure. |
Move Right | Moves the marked position down one level in the BOM structure. |
Open Next Level | In a multi-level BOM, opens a new page that displays entries of the next level only. The selected item must have the Type = Item and have a substructure. If a lower BOM level does not yet exist, a message opens asking if a lower BOM level should be created. Only the current assembly is displayed in this view and can be edited here. To open this page without using this function, choose the value in the Sub BOM field. |
Attributes (DM) | Opens the attributes that were assigned to the construction line. Attributes can also be assigned manually here. |
Characteristic Search Tree | Opens the Characteristic Search Tree page, where you can search for items to be added to the construction BOM based on specified characteristics assigned to the items (see Search Characteristics). |
BOM | Opens the current construction item and its substructure in an editable format. |
Reserve | Enables reservations to be made manually (for example from the warehouse stock). |
Reserve Ledger Entry | Displays the reserved quantity when reservation items have been generated for this position (for example, from the date of promised delivery). |
Item Tracking Lines | Assigns item tracking to components that are subject to management in batches or by serial numbers; standard Microsoft Dynamics 365 Business Central functionality. |
Create Separate Prod. Order | Creates a production order for construction order lines that have the Separate Prod. Order checkbox selected. |
Cut | Enables individual items, multiple items and complete structures from the same or a different construction order to be cut and copied to the clipboard. |
Copy | Enables individual items, multiple items and complete structures from the same or a different construction order to be copied to the clipboard. |
Paste | Inserts a line that was copied to the clipboard from the same or a different construction order. Individual items, multiple items and complete structures can be inserted. |
Comments | Comments can be informatively entered; standard Microsoft Dynamics 365 Business Central. |
Dimensions | Opens the Dimension Set Entries page, which displays the non-editable dimensions assigned to the construction order line. |
Tools | Tools information can be informatively entered; standard Microsoft Dynamics 365 Business Central. |
Personnel | Personnel information can be informatively entered; standard Microsoft Dynamics 365 Business Central. |
Quality Measures | Quality measures can be informatively entered; standard Microsoft Dynamics 365 Business Central. |
Line Texts | If you have the integration with Advanced Manufacturing Suite (AMS), this action is available. For more information, see Text from checklists. |
Drawing Set | If you have the integration with Advanced Manufacturing Suite (AMS), this action is available. For more information, see Drawings in COSMO Discrete Manufacturing. |
Functions Menu
The actions on the Functions menu of the Lines FastTab are described in the following table.
Action | Description |
---|---|
Request BOM from Line | Opens the Master BOM for the component in a construction line, if it has its own master BOM. |
Purch. G/L Acc./Item | Creates a purchase quote/order or requisition line for a component or against a G/L account for an item that does not yet exist for demand and normally would never be created (see Create Purchase Documents for G/L Accounts and Components and Construction Line Planning Pool). |
Create Items & BOMs | Used with the integration of COSMO Process Manufacturing (see Items and Production Structures from Configurations). |
Components Planning Pool | Opens the Construction Line Planning Pool page, which shows the availability of required components for the construction order line. For more information, see Construction Line Planning Pool. |
Schedule FastTab
The fields on the Schedule FastTab are described in the following table.
Field | Description |
---|---|
Starting Date | The start date can be entered manually here. In the case of backward scheduling, the start date is calculated automatically starting from the end date. NOTE: For components of an assembly group that are linked to a routing line via a Routing Link Code, the Due Date is based on the Starting Date from the routing line. |
Ending Date | The end date is populated with the Shipment Date from the General FastTab. In the case of forward scheduling, the end date is calculated automatically starting from the start date. |
Home Menu
The actions on the Home menu of the Construction Order page are described in the following table.
Action | Description |
---|---|
Request BOM | Opens a dialog page that enables the complete master BOM or production BOM/routing of the item in the construction header to be opened. However, to do this all the construction lines must be deleted first. - If a master BOM exists for the item, it is displayed in the top of the page. - If no production BOM or routing exists for the item, the related toggles are inactive. - If a production BOM and routing exists for the item, the toggles are active and the description of each is shown to the right. If there is a master BOM, the toggles are turned off. If there is no master BOM, the toggles are turned on automatically. To choose the production BOM/routing over the master BOM, turn on the toggles. In any case, you can decide whether only one or all levels of the BOM need to be opened and then choose the OK button to assign the BOM to the sales line as the construction BOM. NOTE: If a production BOM/routing exists but a master BOM doesn't exist, you will get an error if you turn off the toggles and choose the OK button. If the configuration feature is being used, the entries in the document checklist are considered (see Configuration Setup and Usage). |
Create Prod. Order | Creates a production order for the entire Construction Order. |
Schedule | With this function, scheduling occurs based on the construction order. In this case, scheduling considers all the times for resources, work centers and groups of work centers entered in the construction order. The items are always scheduled so that they must be available to an assembly at the start of the first series of operations. Limited capacities are taken into consideration. The following types of scheduling are possible: - Forward: Scheduling of the construction order is performed for the future starting at the start date. The Starting Date field is available in the construction header and is transferred from the sales order. It can, however, also be entered manually. - Backward: Scheduling of the construction order is performed backward starting at the end date. The Ending Date field is available in the construction header and is transferred from the sales order. It can, however, also be entered manually. |
Transfer Due Date in Shipment Date | This function enables the scheduling result to be transferred into the Shipment Date on the construction lines. |
Update Unit Cost & Price | Updates the unit cost and unit price of lines (Type <> G/L Account, Purchase Status <> Purchase Posted) with the current costs and prices. For more information, see Update Unit Costs and Prices. |
Matrix per Version | Opens the DM BOM Matrix per Version Matrix page, which compares the containing components from all Construction Orders that belong together, including their archived versions. For more information, see Compare CTO BOMs with Matrix per Version. |
Report Menu
The action on the Report menu of the Construction Order page is described in the following table.
Action | Description | |
---|---|---|
Print BOM | Generates a printout of the construction order (header and BOM lines). | |
Print Lines | Generates a printout of the construction BOM lines only. |
Release Menu
The actions on the Release menu of the Construction Order page are described in the following table.
Action | Description |
---|---|
Release | Changes the status of the construction order to Released. Lines with this status are relevant for requirements if this is defined in the Configure to Order Setup page. Additionally, a variant code will be created automatically for released lines with Part Type = Purchase. |
Work Preparation | Changes the status of the construction order to Work Preparation. Running this function opens a message asking to change lines with Status = Open to the same status. Choose the Yes button to change all Open construction lines to Status = Work Preparation or the No button to keep Open construction lines with Status = Open. Construction Orders with this status are available for the Work Preparation department and can be changed, but are not used in supply planning and cannot generate production orders. |
Reverse Status | Reopens the construction order to change it after it has been approved. An approved construction order has the Released status and must be set to Open before it can be changed. |
Actions Menu
The actions on the Actions menu of the Construction Order page that are not in the other menus are described in the following table.
Action | Description |
---|---|
Document Schedule | Either opens a generated Document Schedule or you are asked to create one if the construction order is linked to a sales order (see Operation Scheduling). |
Components Planning Pool | Opens the Construction Line Planning Pool page, which shows the availability of all required components. For more information, see Construction Line Planning Pool. |
Assign New Line No. | This function enables the lines of the construction order to be renumbered. This is necessary when no further new lines can be added to the construction order using the Auto Split Key function of Microsoft Dynamics 365 Business Central. |
Reserve | Enables reservations to be made manually (for example, from the warehouse stock). |
Item Tracking Lines | Here item tracking can be assigned to components that are subject to management in batches or by serial numbers; standard Microsoft Dynamics 365 Business Central functionality. |
Transfer Changes to Prod. Order | Transfers changes that were executed after the creation of a production order from the construction order (see Transfer Changes to Prod. Order). |
Transfer Back to Service BOM | Updates the Service BOM if lines were changed in a construction order that was created from a Service Order (see Create Construction Order from Service Item Worksheet). |
Archive Construction | Creates an archived version of the construction order. The archived versions can be opened from the construction order header by choosing the value in the No. of Archived Versions field. |
Switch Const.-/Prod. View | Switches between the construction view and the production view. |
Archive and Finish | Archives the current construction order and deletes the current version. Normally this function is used when the construction order has been completed. |
Create Items & BOMs | Creates new Production BOMs and Master BOMs using the Construction Order. New Items are also created and will be written to the Construction Lines. For more information, see Create Items and BOMs. If the integration of COSMO Process Manufacturing is used, this action will create a new Production Structure using the Construction Lines. For more information, see Items and Production Structures from Configurations. |
Related Menu
The actions on the Related menu of the Construction Order page that are not in the other menus are described in the following table.
Action | Description |
---|---|
Checklist | Opens the associated document checklist. |
Prod. Orders | Opens a list of all production orders that have already been generated for individual lines of the construction order. |
Structure Representation | Displays the construction order in a tree-structure where you can expand or collapse the different levels. If you have the integration with Advanced Manufacturing Suite (AMS), the Document Box FactBox from COSMO Document Management System is available in the Structure Master BOM Lines page. For more information, see Integration of COSMO Document Management System. |
Graphical Structure Representation | This function is currently under development. |
Calculation | Opens the Calculation Card or Calculations page to create a new calculation or to view an existing calculation. For more information, see Integration of COSMO Calculation. |
Attributes (DM) | Opens the attributes that were assigned to the construction order header. Attributes can also be assigned manually here. |
Header Texts | If you have the integration with Advanced Manufacturing Suite (AMS), this action is available. For more information, see Text in construction order header and Line text transfer from sales line. |
Drawing Set | If you have the integration with Advanced Manufacturing Suite (AMS), this action is available. For more information, see Drawings in COSMO Discrete Manufacturing. |
FactBoxes
The Construction Header Details FactBox provides information about the construction order header, including access to the related checklists, calculations, production orders, and document schedules.
The Construction Line Details FactBox provides information about the selected construction order line, including access to the card of the related type, availability, substitutions, sales prices and line discounts, purchase prices, attributes, production view, rounding precision, replenishment system, and reordering policy.
If you have the integration with Advanced Manufacturing Suite (AMS), the Document Box FactBox from COSMO Document Management System is available. For more information, see Integration of COSMO Document Management System.
If you have the integration with Advanced Manufacturing Suite (AMS), the Drawing Set and Line Drawing Set FactBox from COSMO Product Data Management is available. For more information, see Drawings in COSMO Discrete Manufacturing.