Search Results for

    Show / Hide Table of Contents

    Concurrent Beginning

    Concurrent Beginning enables simultaneous checking in of an FDC Resource at different FDC Work Order Operations. A Concurrent Beginning of the same FDC Resource at the same FDC Work Order Operation is always declined. This function is determined by the value in the Concurrent Beginning field in the FDC Setup page. The options are:

    • Prohibited – allows only one (active) check in (Input Journal Type = Begin) of the FDC Resource. This includes "Come" in the FDC Terminal. The beginning of a break (Entry Subtype = Break Time) is still possible.
    • Current Work Area – allows a Concurrent Beginning of FDC Work Order Operations in the same FDC Work Area of the FDC Resource.
    • Always – allows beginning FDC Work Order Operations in foreign work areas.
    • Auto Order Bundle Creation – automatically combines all concurrent routing lines of an order bundle for a resource.

    See Also

    FDC Setup
    FDC Terminal


    Feedback
    Submit feedback for this page .

    In This Article
    Back to top 2025 © COSMO CONSULT - Data protection - Imprint