As opposed to sales documents, different calculation types can be created for production order lines.
Expected cost calculations consider the production order BOM and routing and can be created for:
- Simulated production order lines
- Planned production order lines
- Firm Planned production order lines
- Released production order lines
- Finished production order lines
Actual cost calculations consider all posted values for a production order line and can be created for:
- Released production order lines
- Finished production order lines
If no calculation is available for the production order line, no calculations are displayed in the Calculations page. Choose the New action to create a new calculation and then choose the Enter key to assign a number. It is possible to create more than one calculation for one production order line.
If the Standard Calc. Schedule No. field on the item used in the production order line is filled in, the standard calculation schedule is used for the new calculation. Otherwise the Calculation Schedules page opens for you to select a calculation schedule manually.
The values of the production order line are transferred to the calculation header; note that the Replenishment System field is set to Prod. Order because the item has a Production BOM. The link between the production order line and the calculation is shown on the Document FastTab in the Calculation Card.
Calculation Groups in BOM and Routing
Item and capacity calculation groups are transferred from the item and work center or machine center via routing lines and production BOM lines to the production order routing lines and production order components.
Since production order calculations use the calculation groups from the production order routing lines and production order components – not directly from the item and work center or machine center – the calculation groups can be changed on the components and/or routing lines for the production order.