Table of Contents

Production Orders (Blocked)

A two-level component stock warning for manufacturing dispatchers and purchasers, so components are on stock when needed.

Production Orders (Blocked) report

As a manufacturing dispatcher or purchaser, this report page might be yours. To ensure good progress it is important that components are on stock when needed during the production process. The report provides a two-level warning. Components produced by another production order are handled differently.

At a glance

Generated from the report definition (FA (geblockt) / FA (geblockt)).

  • Key visuals: 2× table

What this report helps you do

  • Detect production orders at risk because required components are not on stock
  • Distinguish short-term (7-day) warnings from longer reorder-time warnings
  • Parameterize the component due-date check period to match reorder times

Visuals on this page

Stock-warning KPIs

The two-level component availability warning.

  • # Stockwarnings (+7d) compares expected component consumption due in the upcoming 7 days with the current stock level; when the need exceeds stock, a warning indicates required action
  • # Stockwarnings covers components with longer reorder times; use the Check Comp. Due in upcoming days parameter in the left slicer section to parameterize the checking period

Typical use cases

  • Component shortage prevention — Act early on components that will not be available when production needs them.
  • Reorder-time-aware planning — Extend the check horizon for components with long reorder times.
  • # Stockwarnings
  • # Stockwarnings (+7d)
  • Quantity at Risk (out of stock)

See the full KPI & measure catalog for definitions and formats.


Back to all Manufacturing (Discrete) standard reports · Semantic model · Key business questions