Search Results for

    Show / Hide Table of Contents

    Integration of COSMO Quality Assurance

    The integration of COSMO Quality Assurance to COSMO Discrete Manufacturing provides a seamless and efficient process for quality assurance testing of discrete manufacturing orders using Document BOMs and Construction BOMs.

    This integration enables the assignment of a Test Plan to Master BOMs and Document/Construction BOMs, with the ability to change the Test Plan on Document/Construction BOM lines. The Test Plan No. assigned to component or operation lines in the Master BOM are automatically transferred to the Document/Construction BOMs.

    When creating Production BOMs from Document BOMs, the Test Plan No. transfers to the corresponding field in the Production BOM. Similarly, when creating Routings from Document BOMs, the Test Plan No. and Test Order Relevance transfers to the corresponding fields in the Routing.

    The testing related to discrete production orders is supported by COSMO Quality Assurance in the same manner as other production inspections, including:

    • Creation of a test order depending on Quality Assurance settings, such as automatically creating a test order when the production order is released.
    • Test Plan assignment of source type Component and Operation to select the assigned Test Plan of Document BOM to create a new Test Order.
    • Other relevant configurations of COSMO Quality Assurance such as the From the Same Lot function.

    For detailed setup, configuration, and usage information about COSMO Quality Assurance, see the COSMO Quality Assurance Help.

    The following table describes a sequence of tasks, with links to the topics that describe them.

    To See
    Set up Test Plans usage for Components and Routings and assign Test Plans in Master BOM, Document BOM, and Construction Order lines. Test Plan Setup in Test Plan Assignment and BOMs
    Access the Test Plans in Prod. Order Components/Routings and create Test Orders. Test Plan Usage in Prod. Order Components/Routings and Test Order Creation

    Feedback
    Submit feedback for this page .

    In This Article
    Back to top 2025 © COSMO CONSULT - Data protection - Imprint