Integration to Microsoft Dynamics 365 Business Central
The integration of resource scheduling in COSMO Process Manufacturing with Microsoft Dynamics 365 Business Central contains an extensive structure of many connected components, as the following graphic illustrates.
Personnel/resource requirements are determined on the basis of individual requirements that are required for activities such as setup and processing:
- Individual manufacturing skills and qualifications are managed per resource and team affiliation through the assigned Work Center in its groups
- Distinction between required and desired needs
- Multiple assignment of the resource, if required by the operations
Requirements for suitable resources are formulated at operations in routings or in Production Structures. These are specified in Skill Sets by required number of resources, skill and awareness. The expected awareness needed to perform individual operations is specified to manage multi-machine work. All of this master data is transferred to the Production Order Routing as Prod. Order Capacity Resource Need.
The personnel/resource deployment plan is updated with each production order:
- Automated allocation of suitable employees/resources taking availability into account
- Consideration of the achieved coverage of demand as well as the under-coverage per employee, per requirement profile (role) and per production order
- Representation of the shift scheduling according to shift, day, week, month, year, and user-specific shift specification
See Also
Resource Skills Setup
Resource Needs in Production
User Setup
Feedback
Submit feedback for this page .