Table of Contents

What's New in Version 13.0

Version 13.0.2 of COSMO Advanced Manufacturing Pack is a Hotfix of the 13.0.1 release.

Version 13.0.1 of COSMO Advanced Manufacturing Pack is a Hotfix of the 13.0.0 release.

Note

Hotfix 13.0.1 reinstates the original "Components Planning Pool" page across Process Manufacturing due to issues with the extended filtering capabilities in the page introduced in version 13.0. References to the new page in the Feature Changes and Removed or Deprecated Features sections below no longer apply as of this hotfix.

Version 13.0.0 of COSMO Advanced Manufacturing Pack adds new features, improvements, and fixes issues to enhance your overall experience.

Release Date: August 21, 2026

Feature Changes

The new features as well as any enhancements and/or improvements to existing functionality that are included in this release are listed in the following tables.

Discrete Manufacturing

Pull Request Description Learn More
PR20920 Added "Auto. Write Back Values" field to the Checklist Version that determines if the values of the Checklist are written back automatically to the source document when the Checklist is closed.
PR20996 Added a "Status" field to the Document BOM Header, and "Open" and "Closed" views to the Document BOMs list, to indicate whether a Document BOM's source document is still active or has been finished. Link
PR21063, PRG00002 Added Service Item Contacts management to the Discrete Manufacturing module, adding "Sell-to Contact No.", "Ship-to Contact No.", and "Building Site-to Contact No." fields to the Service Item, each linked to a configurable Service Contact Role. Contact assignments are copied automatically to new Service Items created from Sales Orders and Service Orders. Link
PRG00015 Added a "GETBOMVALUE" function to the Calc. after Line formula editor for Sales Line attributes that retrieves a variable or attribute value from the related Document BOM. Link
PRG00016 Made the "Inventory" action on the Location Card and Location List available regardless of whether Discrete Manufacturing is activated, allowing users to open the "Inventory per Location" report without enabling the Discrete Manufacturing application area. Link
PRG00033 Added a lookup to the "Value (alphanum.)" field on attribute pages, such as the BOM Component, Sales Line, and Purchase Line Attributes pages, and made the field visible by default.

Discrete Manufacturing / Calculation

Pull Request Description Learn More
PRG00029 Added support for standard Microsoft Subcontracting prices when calculating the direct unit cost for subcontracted requisition lines, in addition to the existing custom price and discount sources. Link

Process Manufacturing

Pull Request Description Learn More
PR21005 Added "Change Work Center by Production Structure" action to the Sequence Planning and Planning Pool pages that lets users select a certified production structure variant for the production order line's item, then simultaneously changes the production structure and sequence planning work center and refreshes the production order. The action is available as a split button next to "Change Work Center" and requires "Allow Product Design Change" to be enabled in the Process Manufacturing Setup. Link - Planning Pool, Link - Sequence Planning
PRG00007 Added Manufacturing Date tracking to Physical Inventory Orders and Recording for items that require Manufacturing Date tracking, allowing users to enter, view, and retain the date through finishing, posting, and posted records. Link
PRG00009 Added a "Components Planning Pool" page that provides advanced filtering by manufacturing dimension and item attribute, in addition to the existing production order, item, and work center filters. The new page replaces the "Components Planning Pool (Legacy)" page across the Process Manufacturing planning and production order line pages. Link

Process Manufacturing / Graphical Extension

Pull Request Description Learn More
PRG00032 Added a "Graphical Shift Scheduling" page that displays resource shift schedules, absences, and extra capacity entries graphically for Process Manufacturing. Added setup fields to the Graphical Extension Setup page to configure the shift scheduling date range and entry colors, along with a "Rebuild Manufacturing Data" action to refresh the underlying data. Link

Project Manufacturing

Pull Request Description Learn More
PRG00031 Added "Project Total Cost" and "Project Inventory Value" fields to the Project Card, Projects list page, and related project pages that show cumulative project cost and inventory value totals, available when Inventory Management is active.
PRG00038 Added "Project Inventory Value" and "Project Total Cost" fields to the Project WIP page, giving project WIP the same project cost and inventory value tracking already available on the Project Card.

Technical Changes

The technical changes (such as new integration events, permission set changes, etc.) that are included in this release are listed in the following tables.

Advanced Manufacturing Pack

Pull Request Description
PR21063, PRG00009, PRG00032 Updated "CCS AMP ALL" permission set.

Discrete Manufacturing

Pull Request Description
PRG00017 Added integration events to the "CCS DM Subscribers" codeunit to control the Order Tracking Relevance flag set on Construction Line and Document BOM when a production order line or component is deleted.
PRG00030 Added a key to the "CCS DM Construction Line" and "CCS DM Document BOM" tables to improve performance when planning Unplanned Demand.

Project Manufacturing / Purchase Quote Manager

Pull Request Description
PRG00035 Added integration events to the "CCS PR Job Order Network Mgt." codeunit and the "CCS PQM Placing Matrix" page.

Bugfixes

The issues from the previous version of the app that were fixed in this release are listed in the following tables.

Advanced Manufacturing Pack

Pull Request Description
PR20997 Fixed issue in which decimal fields displaying monetary amounts and quantities across the Calculation, Discrete Manufacturing, Process Manufacturing, and Project Manufacturing modules did not show the correct currency symbol or decimal format under Business Central 28.

Calculation

Pull Request Description
PRG00001 Fixed issue in which renaming a Production BOM or Routing left outdated references in Calculation Headers, Calculation Detail Lines, Reverse Calculation Headers, and their archived versions.

Calculation / Discrete Manufacturing

Pull Request Description
PRG00023 Fixed issue in which calculating a BOM or a Construction Line that contained a Subcontracting Work Center could leave orphaned temporary "Item Unit of Measure" records instead of deleting them after use.

Calculation / Process Manufacturing

Pull Request Description
PRG00026 Fixed issue in which calculating an item with a production structure variant did not include the "Sprue Bush Weight" configured on the Work Center in the quantity of "Share of Recipe" components, understating the required component quantity and cost.

Discrete Manufacturing

Pull Request Description
PRG00025 Fixed issue in which looking up the "External Service Item No." field on the Work Center card failed when extended price calculation was disabled, because the "Purchase Price" table used for the lookup no longer had a default lookup page in Business Central.
PRG00027 Fixed issue in which creating a Transfer Order for a subcontracted item with an enclosure always overwrote the "Flushing Method" on the Prod. Order Component with the item's default value, even when no Stockkeeping Unit existed for the component's item, variant, and location.

Process Manufacturing

Pull Request Description
PR21075 Fixed issue in which entering an overdelivery quantity on a split Warehouse Pick line applied the additional quantity to the wrong related pick line, and could increase "Qty. to Handle" beyond the "Qty. Outstanding" on that line.
PRG00010 Fixed issue in which drilling down from the "Production BOM Version Code" or "Routing Version Code" field on the Production Structure, Manufacturing Structure, and Laboratory Structure pages showed versions from unrelated Production BOMs or Routings instead of only those for the current record.

Process Manufacturing / Graphical Extension

Pull Request Description
PRG00021 Fixed issue in which the error shown when a production order could not be moved before or behind in the Graphical Sequence Planning view did not include the affected production order number.

Project Manufacturing

Pull Request Description
PR20948 Fixed issue in which the "Transfer" caption of the "Procurement Channel" field caused ambiguity in the German translation. Renamed the caption to "Inventory Transfer" in the Procurement Channel field and related tooltips on the Item, Item Availability Lines, and Item Availability by Location Lines pages.
PRG00005 Fixed issue in which recalculating project procurement demand created duplicate Project Line Procurement lines for components that already had a finished procurement line instead of updating the existing line.
PRG00011 Fixed issue in which the "Proc. Signal Tolerance Green" and "Proc. Signal Tolerance Yellow" field captions and tooltips on the Project Card did not specify that values were measured in days.
PRG00012 Fixed issue in which recalculating project procurement demand for a component on a Construction Order or Production Order created a Project Line Procurement line whose "Procurement Location Code" was overwritten by the default location for the "Procurement Channel" instead of retaining the component's own location.
PRG00013 Fixed issue in which the Description and Description 2 from the Project Line Budget were not copied to project-related Production Order Lines unless the production order was created from a Project Line Budget.
PRG00018 Fixed issue in which the item variant was not transferred to Service Order lines created from project procurement.
PRG00022 Fixed issue in which validating the "Project No." field on a Purchase Line of Type = G/L Account, Item, or Resource that had no "No." entered caused an invalid direct unit cost calculation error.

Removed or Deprecated Features

The obsolete controls, objects, and methods that were removed or deprecated in this release are listed in the following table.

Pull Request Type Description Replaced by Module
PR21005 Deprecated procedure Deprecated GetValidProdStructur procedure on the Production Structure Management codeunit. GetValidProductionStructureVariant procedure PM
Deprecated procedure Deprecated DetermineOperation procedure on the "CCS PX Sequence Planning" codeunit. CCS PX Seq. Work Center Mgt. codeunit PM
Deprecated procedure Deprecated ChangeProdOrderOperation procedure on the Sequence Planning Sub page. CCS PX Seq. Work Center Mgt. codeunit PM
Deprecated event Deprecated OnGetValidProdStructurOnAfterSetProductionStructureHeaderFilters integration event. OnGetValidProductionStructureVariantOnAfterSetProductionStructureHeaderFilters event PM
PRG00003 Removed page Removed obsolete "Variable Options", "Variable Option Allocations", "Variable Option Allocations Error", "Options", and "Variable Options Picture" pages from the Discrete Manufacturing Configurator, which had been pending removal since version 12.2 due to an Input field length increase from Code[50] to Code[100]. "Variable Options2", "Variable Opt. Settings2", "VariableOptSettingsErr2", "Variable Option List2", and "VariableOptions Picture2" pages DM
Removed page Removed obsolete "Archive" page (Standard Tasks Archive) due to a SourceTable ID change. "Standard Tasks Archive2" page DM
Removed table Removed obsolete "Variable Option" and "Variable Option Allocation" tables due to an Input field length increase from Code[50] to Code[100]. "Variable Option2" and "Variable OptionSetting2" tables DM
PRG00009 Deprecated page Deprecated "CCS PX Comp. Planning Pool" page. "CCS PM Comp. Plan. Pool Card" page PM

Hotfixes

The hotfixes for this release are listed in the following table.

Hotfix No. Release Date Pull Request Description Module
13.0.2 2026-09-09 PRG00054, PRG00061 Fixed issue in which purchase order lines linked to a production order operation, and their open warehouse receipt lines, could hold an incorrect "Subc. Purchase Line Type" value, causing incorrect warehouse receipt creation for subcontracted operations. DM
PRG00055 Fixed issue in which the "Subc. Location Code" field on the Vendor was not automatically filled from the "Location Code Subcontracting" field for existing vendors, and did not stay in sync when the "Location Code Subcontracting" field was later updated. DM
PRG00057 Fixed issue in which delivery tolerance confirmations in production and output journals could appear unnecessarily during Item No. validation or after reopening a journal, and in which output quantities were not reevaluated when an operation changed to the final operation. PM
PRG00060 Fixed issue in which posting a partial warehouse receipt for a subcontracting operation that was not the final routing operation could fail. DM, PM
PRG00063 Fixed issue in which opening "Where-Used" or "Item Availability by Event" for production structures and SKUs failed with a missing Item Unit of Measure error, or returned incorrect quantities, when a component's unit of measure was not set up for the finished item. PM
PRG00064 Removed the obsolete "Work Center List" report action from the "Insert Work Centers", "Sequence Work Centers", and "Tool Work Centers" pages, for compatibility with Business Central 29. PM
13.0.1 2026-08-31 PRG00042 Reinstated the original "Components Planning Pool" page across Process Manufacturing due to issues with the extended filtering capabilities in the page introduced in version 13.0. PM

Technical Specifications

The required minimum version of Business Central, COSMO Licensing, and any dependent apps are listed in the following table.

Details Version
Requires Microsoft Base Application 28.3.0.0
Requires COSMO Licensing 2.7.0.0
Requires COSMO Graphical Extension 8.0.0.0
Requires COSMO Integration Interface 1.0.0.0

Feedback