Production Structures
This section describes setup and functionalities that relate to Production Structures in COSMO Process Manufacturing.
The following table describes a sequence of tasks, with links to the topics that describe them.
To | See |
---|---|
Learn about the fields and actions on the Production Structure page. | Production Structure Setup |
Learn the difference between production BOMs and recipes. | Production BOMs vs. Recipes |
Learn about the fields and actions on the Production BOM page that relate to recipes. | Recipes |
Calculate density with unit of weight and unit of volume. | Unit of Weight and Unit of Volume |
Assign default location and bin codes to production structure lines for transfer to production order components. | Default Location/Bin Codes |
Learn about routings and setting up parallel operations in Production Structure lines. | Routings |
Choose which sequence work center in the Production Structure lines should be used for sequence planning if multiple sequence work centers are entered. | Identify Operation for Sequence Planning |
Learn how setup times and production rate values of machines are used for calculating Production Orders if the routing line has no data. | Work Center Production Rates |
Set a constant production rate time on certain intervals of the production rate quantity. | Fixed Step Production Rate Time |
Add additional products to an existing recipe. | Incorporation |
Automatically calculate the optimal quantity per unit of measure on Production Structure lines. | Calculation Unit of Measure |
Create different production structures for one item depending on criteria such as locations, units of measure, and quantities. | Production Variants |
Simulate the calculation of a certain quantity for the needed work operations and materials in a Production Structure. | Production Structure Simulations |
Search production BOMs and exchange items in Production Structure lines. | Exchange Production BOM Item in Production Structure |
Feedback
Submit feedback for this page .