Supply of Material (Enclosures)
Assembly subcontracting can be mapped with supply of material. In this case, the items provided are predefined in the Assembly BOM. However, these settings can be changed during order handling.
Assembly BOM
In the Assembly BOM, the Enclosure and Enclosure Drop Shipment fields determine whether an item is a supply of material and if it drop shipped to the vendor.
Note
Content relating to the Enclosure Drop Shipment functionality is in progress.
Locations
To map the supply of material accurately, at least two Location Codes should be defined:
- One Location Code from which material is provided.
- One Location Code to which the material to be provided is transferred. This is generally the storage location of the subcontractor.
If several subcontractors are being used, define a separate Location for each subcontractor.
Transfers
The transfer can occur from either the:
- Item Reclassification Journal
- Transfer Order
The manner in which the transfers are mapped is defined in the Configure to Order Setup page (see Manufacturing FastTab).
The subcontracting step is performed by storing a vendor number in the Subcontractor No. field on the Resource Card. The subcontractor's storage location code to where the material provided is to be transferred is entered on the Vendor Card.
Feedback
Senden Sie Feedback für diese Seite . (Beachten Sie, dass diese Umfrage auf Englisch ist.)