What's new in version 6.1
Version 6.1.163036.0 of COSMO Advanced Manufacturing Pack is a Hotfix of the 6.1.162156.0 release.
Version 6.1.162156.0 of COSMO Advanced Manufacturing Pack is a Hotfix of the 6.1.160889.0 release.
Version 6.1.160889.0 of COSMO Advanced Manufacturing Pack adds CTO Setup Wizard, warehouse receipt processing with external production, quick insertion of variables/dyn. user functions in Checklist Template lines, and better visibility of active Master BOMs in COSMO Discrete Manufacturing; saves user-specific settings in Copy Item page for COSMO Discrete Manufacturing and COSMO Process Manufacturing; and adds a setup page for COSMO Project as well as integrates COSMO Project into the standard Cashflow "Suggest Worksheet Lines" report.
This release adds other improvements and fixes issues found in the previous version of the app.
Features and enhancements
The following features are included in this release:
Pull Request | Description | Module |
---|---|---|
PR8129 | Added event publisher to multiple codeunits. | PQM, PR |
PR8476 | Changed "Open" action caption to "Open Card" in My Jobs part. | PR |
PR8504 | Added Location Code for Sales for Intra Community Taxation. | PR |
PR8509, PR8867 | Created CTO Setup Wizard and added to Assisted Setup. | DM |
PR8615 | Added user-specific AMP setting saving in Copy Item page. | DM, PM |
PR8622 | Included purchase lines for External Production in Warehouse Receipts. | DM |
PR8631 | Added event publisher to "CCS PM Deliv. Tol. Services" codeunit. | PM |
PR8664 | Added option to exclude Prototype Items from Create Item and BOMs function. | DM |
PR8675, PR8681, PR8683, PR8690, PR8788 | Preparation for upcoming Graphical Structure Representation for Master BOMs. | DM, GX |
PR8679 | Replaced old "GetSelectionFilter" procedures with standard BC procedures. | PM, PR |
PR8688 | Added transfer of Person Responsible from Inventory Request to Posted Inv. Request. | PR |
PR8700 | Enabled GX Update Process when opening GX pages. | GX, PR, PX |
PR8708 | Added quick insertion of Variables and Dyn. User Functions in Checklist Template Lines using AssistButton in Formula fields. | DM |
PR8715 | Added field and action to make active version of Master BOM more visible in Master BOMs list and field when requesting a Master BOM. | DM |
PR8726 | Integrated COSMO Project into standard Cash Flow "Suggest Worksheet Lines" report. | PR |
PR8745 | Added new setup page for COSMO Project that contains app activation. | AMP, GXPR, PR |
PR8751 | Added events to "CCS PRPL Job Process Mgt." codeunit and updated tests/subscription. | AMP, GXPR, PRPL |
PR8777 | Added control of Price Source for Calculations based on Jobs. | CA, PR |
PR8806 | Added event publishers to "CCS PR Job Calc. Schedule Mgt." codeunit. | PR |
PR8816, PR8822 | Created Enum for Character. Struct. Tree Type and added Setup Time/Run Time to Character. Struct. Tree for use in Structure Representation. | DM, GX |
PR8826 | Added event publisher to multiple codeunits. | PM, PX |
PR8827, PR8975 | Preparation for upcoming Graphical Construction Order Structure. | DM, GX |
PR8859 | Added SetLoadFields to Prod. Order Line and Prod. Order Routing Line requests to improve performance. | GXPX |
PR8862 | Added new publisher to "CCS AMP Prod. Order Component" table extension. | PM |
PR8919 | Replaced Page.RunModal with Page.Run and added Line Type check in Job Line Budget table. | PR |
PR8935 | Added action to create Dummy Prod. BOM in Jobs Setup. | PR |
PR8968 | Optimized performance for "Job Budget Calculation" page. | PR |
PR8972 | Added Wait Time and Move Time to Construction Line pages. | DM |
PR8982 | Replaced obsoleted procedure call in "CCS PX Utilization WC" page. | PX |
PR8989 | Expanded Item Availability by BOM Level by including recipes. | PM |
PR8993 | Extended event publisher in "CCS PX Mfg. Dimension Mgt" codeunit. | PX |
PR9001 | Updated permission set "CCS AMP ALL". | AMP |
Bugfixes
This release fixes the following issues found in the previous version of the app:
Pull Request | Description | Module |
---|---|---|
PR8502 | Fixed issue where it was not possible to create job document BOMs based on production BOMs for items without Master BOMs. | DM, PR |
PR8484 | Fixed issue where releasing job invoice lines did not transfer all description fields to the resulting sales invoice. | PR |
PR8513, PR8514 | Fixed misspelling of table field caption and tooltip. | DM, PM |
PR8537 | Fixed issue where manually setting the "Job Procurement No." in purchase documents skipped the price calculation logic, causing the price fields to stay zero. | PR |
PR8561 | Fixed issue when using "Calculate Plan" from Requisition Worksheet where Quantity was calculated incorrectly. | PR |
PR8575 | Fixed issue when using "Calculate Plan" from Requisition Worksheet where Job-related Purchase Lines were suggested to be canceled. | PR |
PR8649 | Fixed missing Variant Code in Job Invoice creation. | PR |
PR8666 | Enabled QC actions on Lot No. Information Card. | PM |
PR8692 | Fixed issue with calculating Rollup with "Copy From" function only if substructure already exists. | PR |
PR8696 | Added checks when deleting planning resources. | PR |
PR8836 | Fixed length of Sales Discount In Kind fields. | PM |
PR8866 | Fixed field captions in Copy Item request page. | DM, PM |
PR8898 | Fixed summary of purchase procurement types. | PR |
PR8918 | Fixed issue in the Job Line Budget where the Sales Code was not set to <blank> when a quantity was entered in the Quantity Per field. | PR |
PR8926 | Fixed issue where manually created Inventory Requests were not deleted after posting. | PR |
PR8947, PR8965, PR8984 | Fixed various DM tooltips and captions. | DM |
PR8952 | Fixed missing fields in "Price Worksheet" when using "Transfer Purchase Conditions" in Purchase Quote. | PR |
PR8949 | Fixed captions in Resource Card. | PR |
PR8959 | Fixed last operation assignment in Prod. Order line. | PM |
PR8974 | Added usage of variable calculation lot size for Document BOM and Construction Line. | DM |
PR8976 | Fixed calculation of Resource Group Work Hours in Graphical Project Planning, Graphical Project Resource Planning, and Graphical Maintenance Scheduling. | GXPR, GXPX |
Hotfixes
The following hotfixes are included in this release:
Hotfix No. | Pull Request | Description | Module |
---|---|---|---|
6.1.163036.0 | PR9222 | Fixed missing Customer Disc. Group and Line Discount when finding prices from Price List in Job Budget Calculation. | PR |
PR9224 | Fixed missing Customer Price Groups in newly created Jobs. | PR | |
PR9225 | Fixed issues calculating prices when using Sales Price Source = Cost Plus. | PR | |
PR9228 | Fixed update of Last Processed Operation No. and Last Routing Status fields in Production Order line. | PM | |
6.1.162156.0 | PR9121 | Added missing permission to modify Warehouse Entries to the "CCS AMP Upgrade" codeunit. | AMP |
PR9124 | Fixed purchase price calculation in Job Line Budget. | PR | |
PR9125 | Updated product configuration for COSMO Project. | PR | |
PR9126 | Expanded Item Availability by BOM Level by including main recipes. | PM |
Removed or deprecated features
Removed obsolete controls, objects, and methods:
Pull Request | Description | Module |
---|---|---|
PR8945 | Obsoleted disabled placeholder fields. | PQM, PR, PRPL |
Technical specifications
Details | Version |
---|---|
Requires Microsoft Base Application | 21.1.0.0 |
Requires COSMO Licensing | 1.2.0.0 |
Requires COSMO Graphical Extension | 3.3.157417.0 |
Feedback
Senden Sie Feedback für diese Seite . (Beachten Sie, dass diese Umfrage auf Englisch ist.)