What's new in version 9.4
Version 9.4.258863.0 of COSMO Advanced Manufacturing Pack is a Hotfix of the 9.4.254980.0 release.
Version 9.4.254980.0 of COSMO Advanced Manufacturing Pack adds improvements and fixes issues to enhance your overall experience.
Release Date: December 19, 2024
Feature changes
The new features as well as any enhancements and/or improvements to existing functionality that are included in this release are listed in the following table.
Pull Request | Description | Module |
---|---|---|
PR13895, PR14329 | Added resource planning actions to Project Process page. Additionally, improved matrix pages as well as disabled ability to insert/delete records and added start/end dates to Project Process page. |
PR |
PR13919 | Extended "Process planning lines" option in "Copy from" action on Project Budget Calculation to include predecessor and follower of project process lines. | PR |
PR13965 | Improved performance for the description indentation in Project List pages. | PR |
PR13971 | Added "Responsible (Technical)" and "Responsible (Prod.)" fields to Construction Inquiry and Construction Order. Added "Responsible (Technical) Filter" and "Responsible (Prod.) Filter" to Configure to Order Design Engineer role center. |
DM |
PR13975 | Added sub-option "Resource Assignments" to the "Process planning lines" option in the "Copy from" action, which copies the resource assignments of the copied process planning lines. | PR |
PR14072 | Added Description 3, 4, 5 fields to Sales and Purchase subpages. | DM |
PR14078 | Added missing caption and tooltips to Select BOM confirmation dialog page. | DM |
PR14090 | Added status change check when certifying a Master BOM Version. | DM |
PR14095 | Added feature for blocking Variable/Attribute Types. | DM |
PR14102 | Changed input of Boolean variables in Checklist Lines and Checklist Line Templates to recognized true/false entries regionally and by various corresponding inputs. | DM |
PR14127 | Extended the Value Transfer function to transfer the calculated standard cost to an item's stockkeeping units. | CA |
PR14129 | Improved boolean input handling for language independence in QC Templates and QC Tests. | PM |
PR14156 | Prepared code for Business Central 25 compatibility. | AMP, PR |
PR14167 | Improved project procurement document creation. | PR |
PR14214, PR14329 | Added new Time Entry Recording that includes Work Time Recording, Daily Time Recording, and Time Entry Control. | PR |
PR14238 | Added product name to searchable pages in UI. | PRPL |
PR14239 | Added product name to searchable pages in UI. | PR |
PR14241 | Added product name to searchable pages in UI. | PQM |
PR14242 | Added product name to searchable pages in UI. | PM |
PR14243 | Added product name to searchable pages in UI. | GX, PM |
PR14244 | Added product name to searchable pages in UI. | GX, PR |
PR14245 | Added product name to searchable pages in UI. | DM |
PR14246 | Added product name to searchable pages in UI. | CA |
PR14247 | Added product name to searchable pages in UI. | AMP |
PR14259 | Added "Standard Task Code" field to the "Transfer Changes to Prod. Order" action. | DM |
PR14270 | Added a confirmation dialog when changing the item number (or variant code) in the Sales Line when a Checklist already exists for the line. | DM |
PR14276, PR14341 | Added subcontracting for Assembly Orders. | DM |
PR14282, PR14329 | Renamed "Job" to "Project" in label to align with the new Business Central terminology. | CA, GX, PR |
PR14288 | Improved performance and usability of Project Controlling field calculations. | PR |
PR14301 | Added Project Comment Lines FactBox for Procurement Comments to Project Procurement Planning pages. | PR |
PR14302 | Added FactBoxes to Project Processing Invoicing page. | PR |
PR14300 | Added "Order Confirmation Required" field to Vendor Card. | PR |
PR14338 | Unified calls of Job Line Budget views (Budget Calculation, Planning and Processing, Sales, WIP, and Rolling Calculation) to improve consistency and behavior based on from where the view is opened. | PR |
PR14340 | Added setup configuration to save user preferences for grid settings, including size, style, scale, zoom, columns, and order to Graphical Project Planning and Graphical Project Resource Planning views. | GXPR |
PR14344 | Added progress line for Job Scheduling on Graphical Project Planning and Graphical Project Resource Planning views. | GXPR |
PR14345 | Added actions in Project Role Centers to open filtered versions of GXPR views. | GXPR |
Technical changes
The technical changes (such as new integration events, permission set changes, etc.) that are included in this release are listed in the following table.
Pull Request | Description | Module |
---|---|---|
PR13890, PR13944 | Refactored Job Comment Type to extensible Enum. | PR |
PR13901 | Add extensibility option CalculationScheduleNo to "CCS CA Calculation Header" table. |
CA |
PR13935 | Added new integration event to "CCS PQM Management" codeunit. | PQM |
PR13956 | Added new integration event to "CCS PM Item Tracking Mgt." codeunit. | PM |
PR13961 | Added new integration events in "CCS CA Calculation Mgt." codeunit. | CA |
PR13969 | Implemented Confirm Management in the "CCS CA Calculation Mgt." codeunit to enhance the maintainability and scalability of the code by utilizing a centralized confirmation handling mechanism. | CA |
PR13970 | Implemented extensible field change check for the "CCS CA Calculation Mgt." table to ensure that the procedure can be used to check changes for any field within the calculation header. | CA |
PR13974 | Improved performance of view authorization checks for calculation lines in the "CCS CA Calculation Mgt." codeunit. | CA |
PR13977 | Set workdate as starting date for Sales Calculations without Order Date in the "CCS CA Calculation Mgt." codeunit. | CA |
PR13987 | Added new integration events in "CCS CA Calculation Mgt." codeunit. | CA |
PR14001 | Updated folder structure for Process Manufacturing namespaces. Process Manufacturing (PM) and Planning Extension (PX) are no longer treated separately within the namespaces. |
PM |
PR14001, PR14329, PR14355 | Updated/changed "CCS AMP ALL" permission set. | DM, PM, PR |
PR14046 | Added requested integration events in "CCS AMP Prod. Order Line" table extension. | DM |
PR14051 | Added new integration events to multiple codeunits. | PM |
PR14158 | Made variable in the "CCS AMP Item Tracking Lines" page extension available globally for extensibility. | PM |
PR14167 | Added new integration event to "CCS PR Job Procurement Mgt." codeunit. | PR |
PR14200 | Refactored "Manual Pricing" field from Option to Enum. | PR |
PR14208 | Changed "Procurement Channel" field from Data Type to Enum in "Resource" and "General Component" tables. | PR |
PR14285 | Moved "CCS DM Change2" table to correct folder for namespace update. | DM |
PR14307 | Added new integration event to "CCS DM Document BOM" table. | DM |
PR14308 | Added new integration events to "CCS DM Document BOM" table. | DM |
PR14311 | Added new integration events to "CCS AMP Sales Line" table extension. | DM |
PR14325 | Added integration event to "CCS PX Maint.-/Setup Job Mgt." codeunit. | PM |
PR14330 | Added new procedure to set T39_HideDateCheckMessage in "CCS PR Standard Event Subscr." codeunit. |
PR |
PR14346 | Added new integration event in "CCS PR Job Sales Mgt." codeunit. | PR |
Bugfixes
The issues from the previous version of the app that were fixed in this release are listed in the following table.
Pull Request | Description | Module |
---|---|---|
PR13894 | Fixed error that occurred when releasing a Project Procurement line of type "Service" if the "Procurement Cost Source" was "Standard" or "<empty>". | PR |
PR13922 | Fixed error that occurred in the Graphical Project Resource Planning view when manually assigning a resource to a Process Line. | GXPR |
PR13972 | Fixed overflow error that occurred when the difference between minimum and maximum lot size values of a Production Structure variant results in a number with decimal places. | PM |
PR14005 | Changed calculation of requested receipt date when creating a purchase order from project procurement. | PR |
PR14022 | Fixed WBS reset on invalid user entry and further unified the code base for WBS calculation. | PR |
PR14053 | Fixed calculation of Unit Cost for subcontracting Work Center in CTO BOMs if BOM Level > 1. | DM |
PR14069 | Fixed issue in which the "Special Position" and "Special Position No." fields were not reset when copying a project budget line. | PR |
PR14122 | Fixed issue in which Purchase Quotes were not created for Document BOM and Construction Line with Status = Open. | DM |
PR14145 | Fixed error that could occur when posting a subcontracting purchase order in which the subcontracting Work Center uses an External Service Item. | DM |
PR14147 | Fixed dimension restoration after changing "No." field in "Purchase Line" table. | PR |
PR14185 | Fixed calculation of "Qty. Unit of Measure" field in subcontracting Purchase Order and Warehouse Receipts lines. | DM |
PR14233 | Fixed issue of creating Enclosure Transfer Order Lines using components from other Production Order Lines. | DM |
PR14259 | Fixed issue in which the "Standard Task Code" field was not transferred from the Document BOM and Construction Order when creating a Production Order. | DM |
PR14280 | Fixed missing lookup of WBS field in Service Order. | PR |
PR14297 | Fixed issues in PQM action "Transfer Purchase Conditions". | PQM |
PR14315 | Fixed error that could occur when a Checklist opens automatically when inserting the Quantity in a Sales Line and the "Open Immediately" field is activated in combination with "Reserve" = Always. | DM |
PR14343 | Fixed error that could occur when using certain settings in the "Copy from" action in Job Budget Calculation if destination is an empty job. | PR |
PR14354, PR14363 | Fixed issues in "Planning Processes" page with missing filters. | PR |
Hotfixes
The hotfixes for this release are listed in the following table.
Hotfix No. | Release Date | Pull Request | Description | Module |
---|---|---|---|---|
9.4.258863.0 | 2025-01-14 | PR14385 | Fixed error the occurred when creating an item variant via a web service session. | PM |
PR14393 | Fixed issue in which the Quantity per and Expected Quantity fields in production order components were not calculated correctly when a production BOM with a line type Production BOM was used, which was linked via a Routing Link Code to a production order routing line with Fixed Scrap Quantity. | PM | ||
PR14424 | Fixed component unit cost calculation in Detail Calc. Standard Cost page. Renamed Detail Calc. Standard cost page actions to Detail Calc. Production Std. Cost and added tooltips. |
PM | ||
PM14431 | Added requested integration event to "CCS DM Enclose Management" codeunit. | DM | ||
PR14437 | Fixed display of current location in Equipment Location FactBox. | PR | ||
PR14460 | Added integration event to "CCS DM Subscribers" codeunit. | DM | ||
PR14467 | Added Capacity Unit of Measure "Second" to CalcBaseUnitTime procedure, which is used in the "CCS CA Calculation Mgt." codeunit. |
DM | ||
PR14471 | Inhibited unnecessary Prod. BOM Status check when creating Prod. Order from Document BOM or Construction Order. | DM | ||
PR14472 | Fixed displayed value of the Substitute Exist field in the Requisition Worksheets page. | DM | ||
PR14493 | Fixed missing transfer of item default dimensions when using Trading Unit Item Adjustment. | PM |
Removed or deprecated features
The obsolete controls, objects, and methods that were removed or deprecated in this release are listed in the following table.
Pull Request | Type | Description | Replaced by | Module |
---|---|---|---|---|
PR13968 | Code removal | Removed unusable PQM Color procedures. | - | PQM |
Technical specifications
The required minimum version of Business Central, COSMO Licensing, and any dependent apps are listed in the following table.
Details | Version |
---|---|
Requires Microsoft Base Application | 24.0.0.0 |
Requires COSMO Licensing | 2.6.0.0 |
Requires COSMO Graphical Extension | 6.0.0.0 |