What's new in version 6.3
Version 6.3.203210.0 of COSMO Advanced Manufacturing Pack is a Hotfix of the 6.3.196101.0 release.
Version 6.3.196101.0 of COSMO Advanced Manufacturing Pack is a Hotfix of the 6.3.194813.0 release.
Version 6.3.194813.0 of COSMO Advanced Manufacturing Pack is a Hotfix of the 6.3.192787.0 release.
Version 6.3.192787.0 of COSMO Advanced Manufacturing Pack is a Hotfix of the 6.3.189334.0 release.
Version 6.3.189334.0 of COSMO Advanced Manufacturing Pack is a Hotfix of the 6.3.187473.0 release.
Version 6.3.187473.0 of COSMO Advanced Manufacturing Pack is a Hotfix of the 6.3.186901.0 release.
Version 6.3.186901.0 of COSMO Advanced Manufacturing Pack is a Hotfix of the 6.3.178349.0 release.
Version 6.3.178349.0 of COSMO Advanced Manufacturing Pack is a Hotfix of the 6.3.177121.0 release.
Version 6.3.177121.0 of COSMO Advanced Manufacturing Pack is a Hotfix of the 6.3.176237.0 release.
Version 6.3.176237.0 of COSMO Advanced Manufacturing Pack is a Hotfix of the 6.3.175902.0 release.
Version 6.3.175902.0 of COSMO Advanced Manufacturing Pack is a Hotfix of the 6.3.175733.0 release.
Version 6.3.175733.0 of COSMO Advanced Manufacturing Pack is a Hotfix of the 6.3.174654.0 release.
Version 6.3.174654.0 of COSMO Advanced Manufacturing Pack is a Hotfix of the 6.3.173559.0 release.
Version 6.3.173559.0 of COSMO Advanced Manufacturing Pack implements same Scrap % logic used in Routings and Production BOMs into CTO BOMs in COSMO Discrete Manufacturing, skips non-inventory items for component availability check in Prod. Order lines in COSMO Process Manufacturing, adds the new BC Calculation Formula option "Fixed Quantity" to BOMs in COSMO Discrete Manufacturing and COSMO Process Manufacturing, and improves the Search & Replace function as well as other processes in COSMO Project Manufacturing.
This release adds other improvements and fixes issues found in the previous version of the app.
Features and enhancements
The following features are included in this release:
Pull Request | Description | Module |
---|---|---|
PR9266 | Updated editability of AMP table fields. | AMP |
PR9428 | Improved performance of "Update Calculation" in Job Budget Calculation. | PR |
PR9448 | Maintained procedure to transfer Job Journal Lines to Inventory Profiles. | PR |
PR9454 | Added use of Job-specific Payment Method Code when creating sales documents from a Job. | PR |
PR9493 | Added content menu to upcoming Graphical Construction Order Structure for Construction Orders. | DM, GX |
PR9496 | Optimized performance when creating Sales Quotes and Sales Orders. | PR |
PR9499, PR9502, PR9650 | Skipped non-inventory items for component availability check of Production Order lines. | GX, PX |
PR9501 | Increased performance for procedure AMPApplicationAreaActive. | AMP |
PR9504 | Added Person Responsible to Graphical Project Planning View. | GX, PR |
PR9527 | Added new publisher to "CCS PM Maintenance Order" table. | PM |
PR9529 | Added Finished Production Orders in calculation of Production Cost in Jobs. | PR |
PR9545 | Removed orphaned caption in Jobs Setup page. | PR |
PR9546 | Added missing keys to Job and Job Ledger Entry tables to improve performance. | PR |
PR9553 | Implemented the same Scrap % logic in CTO BOMs as in Routings and Production BOMs. | DM |
PR9583 | Added consideration of the "Use Location and Bin Defaults" field in Process Manufacturing Setup when creating Prod. Orders from Document BOM or Construction Order. | DM |
PR9605 | Adapted new BC Calculation Formula option "Fixed Quantity" to AMP BOMs. | DM, PM |
PR9610 | Added Inventory and Inventory Procurement Location fields to Procurement Lines pages. | PR |
PR9626 | Added GXPR tooltip integration events for Job, Job Line, and Assigned Resource. | GX, PR |
PR9761 | Added new event to "CCS PM Item Bottling Mgt." codeunit. | PM |
PR9766, PR9823 | Improved Search & Replace function. | PR |
PR9796, PR9825, PR9826 | Improved performance for various COSMO Project tasks. | PR |
Bugfixes
This release fixes the following issues found in the previous version of the app:
Pull Request | Description | Module |
---|---|---|
PR9557 | Added reset in Search and Replace function after replacement. | PR |
PR9696 | Added Controller values to GXPX Process Controller. | GX, PX |
PR9749 | Fixed "Unit Cost (LCY)" calculation for job linked Sales Lines. | PR |
PR9753 | Fixed initialization of "WBS" field when changing "No." field in Job Budget Calculation. | PR |
PR9772 | Fixed "No Unit Price found" error on Job Procurement release. | PR |
PR9787 | Fixed wrong quantity in Sales Order line when using "Update Sales Order" action in "Job Budget Calculation" page. | PR |
PR9790 | Added Item "Last Direct Cost" for cost calculation in Job Line Budget. | PR |
PR9802 | Fixed transfer of Language Code from Job to Job Shipment. | PR |
PR9811 | Fix visibility of Equipment actions in Resource Card and List pages. | PR |
Hotfixes
The following hotfixes are included in this release:
Hotfix No. | Pull Request | Description | Module |
---|---|---|---|
6.3.203210.0 | PR11074 | Fixed issue in which an error message occurred when entering the Posting Date in Job Time Entries with blank Job No. field. | PR |
PR11142 | Fixed issue in which filters were not reset in Job Procurement Planning page. | PR | |
PR11215 | Fixed the conversion of Duration Quantity in Process Planning if the Fixed Process was set to Duration. | PR | |
PR11251 | Fixed issue in which the Delayed Global Calculation field was not reset correctly after running the "Update Calculation" action. | PR | |
PR11330 | Fixed error that occurred if multiple Job Budget Lines were added to an existing Sales Order between existing Sales Lines with the "Expand Sales Order" action. | PR | |
PR11428 | Fixed issue in which the Job No. was lost in the Purchase Line when an item was selected through the Description field instead of the No. field. | PR | |
6.3.196101.0 | PR11128 | Fixed client timeout for Equipment Issuance. | PR |
PR11132 | Fixed issue in which the line discount was not transferred from the job source to the purchase line when using the classic price calculation. | PR | |
PR11145 | Fixed transferred quantities from CTO BOMs to Prod. Order Components if using Unit of Measures that are not the Base Unit of Measure. | DM | |
PR11163 | Fixed application area of Default QC Template field in Job Types Setup page. | PR | |
6.3.194813.0 | PR11055 | Fixed transferred quantities when creating multi-level production orders from Document BOM/Construction Order when scrap is used. | DM |
PR11112 | Fixed issue in which the calculation for routings with scrap was too high. | DM | |
6.3.192787.0 | PR10861 | Enhanced performance when opening Job Processing Shipment Plan page. | PR |
PR10935 | Added event to "CCS PR Job Copy" report. | PR | |
PR10954 | Fixed issue with calculating prices in calculations with Price Source for Items = Purchase Pricing. | CA | |
PR10991 | Fixed issue in which document totals were not updated after job-related fields were changed in purchase/sales quote/order/invoice lines. | PR | |
PR10996 | Fixed purchase document lookups in Job Procurement Lines. | PR | |
6.3.189334.0 | PR9884 | Added reset of system filters when setting filter fields in Job Procurement Planning page. Added filter fields for Procurement Location Code and Job No. |
PR |
PR10555 | Added IsHandled pattern to event in "CCS PR Standard Event Subscr." codeunit. | PR | |
PR10718 | Added DM keys in Purchase- and Requisition Line tables to increase performance of "Purchase Exists" field in Construction- and Document BOM lines. | DM | |
PR10743 | Fixed issue in which the Undo Purchase Receipt function did not correctly set the Provided Quantity field in Job Ledger Entries. | PR | |
6.3.187473.0 | PR10707 | Fixed formula calculation for assigned resources in Graphical Project Resource Planning view. | GXPR |
6.3.186901.0 | PR10199 | Added new procedures to "CCS AMP Dialog Mgt." codeunit. | AMP |
PR10564 | Added new publisher to "CCS PM Single Instance" codeunit. | PM | |
PR10611 | Fixed reset of "Manual Pricing" in "Update Calculation" action. | PR | |
PR10646 | Fixed missing "Quantity Base" in Job Ledger Entries for purchase postings. | PR | |
PR10657 | Fixed removal of negative Job Inventory Request Lines after posting. | PR | |
6.3.178349.0 | PR10112 | Optimized performance in "CCS PR Update Calculation" report. | PR |
PR10114 | Optimized performance by adding "Manual WBS Calculation" function that calculates the Job Budget Calculation when the page is opened and then only recalculates it when the new "Update WBS" action is run manually. Improved performance for the page search and the general WBS calculation. |
PR | |
PR10117 | Fixed issue with calculating the run time in Prod. Order Routing lines. | PR | |
PR10125 | Expanded publisher in "CCS PM Process Manuf. Mgt." codeunit. | PM | |
PR10128 | Improved "Update Calculation" action in Job Charges page to handle the selection of multiple charges. | PR | |
PR10131 | Fixed Sales Quote quantity calculation in "Update Sales Quote" action. | PR | |
6.3.177121.0 | PR10031 | Added new event to "CCS PM Returnable Cont. Mgt." codeunit. | PM |
PR10045 | Removed check for empty lot- or serial numbers on Item Ledger Entry posting. | PM | |
PR10063 | Made Item Tracking available for Warehouse Receipts of Subcontracting Purchase Orders. | DM | |
6.3.176237.0 | PR9941 | Fixed issue in which the list of Sales Orders that opened from the "Expand Sales Order" action in the Job Budget Calculation showed more than the ones connected to the selected source records. | PR |
PR9998 | Fixed error that prevented the creation of warehouse receipts with partial shipment. | DM | |
PR10006 | Enabled the warning message for the "Qty. to Receive" field when shipping directly from a Purchase Order for Subcontracting Purchase Lines. | DM | |
6.3.175902.0 | PR9982 | Fixed issue when posting Purchase Invoices by adding permissions in "CCS PR Posting Mgt." codeunit. | PR |
6.3.175733.0 | PR9924 | Added new event to "CCS PR Job Post Shipment" codeunit. | PR |
PR9945 | Fixed issue in which the Indirect Cost % was not applied in Purchasing Job Ledger Entries. | PR | |
PR9953 | Fixed issue when opening the Item List in Extended View. | PR | |
PR9958 | Fixed error that occurred in Job Line Budget after selecting component with a Global Default Dimension. | PR | |
PR9970 | Fixed issue in which the Person Resource Filter was not working in Job List. | PR | |
6.3.174654.0 | PR9885 | Fixed creation of additional Job Procurement documents. | PR |
PR9900 | Fixed error on opening Production Journal for Production Order line with Subcontracting Work Center in the Prod. Order Routing line. | PM | |
PR9915 | Added key in Sales Lines table to improve performance. | PR |
Removed or deprecated features
Removed obsolete controls, objects, and methods:
Pull Request | Description | Module |
---|---|---|
N/A | N/A | N/A |
Technical specifications
Details | Version |
---|---|
Requires Microsoft Base Application | 21.1.0.0 |
Requires COSMO Licensing | 1.2.0.0 |
Requires COSMO Graphical Extension | 3.5.0.0 |
Feedback
Senden Sie Feedback für diese Seite . (Beachten Sie, dass diese Umfrage auf Englisch ist.)