Dynamic Master BOM
The Dynamic Master BOM is the second element of the configuration feature of COSMO Discrete Manufacturing. The Master BOMs are opened "dynamically" if they are used for the automatic generation of BOMs relating to orders (Document BOM). In addition, within the BOM lines, formulas are entered. Usually checklists and Dynamic Master BOMs are used together for a configuration. The information entered in the checklist is stored as variables, which are then used for formula evaluation within the Dynamic Master BOM (see Dynamic Checklist).
In addition to the fields previously described, the fields in the following table are specific for dynamic calculations within the Master BOM.
Field | Description |
---|---|
Formula Valid | In this field, enter a formula for use with calculation. Choose the ellipsis button to open the Formula Editor, which can assist with formula creation. The result of the formula evaluation (TRUE or FALSE) determines whether the line – when opening the Master BOM – is transferred to the Document BOM or not. |
Formula Quantity | An alternative to the Quantity field, enter a formula for the calculation of the expected quantity. Choose the ellipsis button to open the Formula Editor. For work centers and machine centers, this field is used for the calculation of the time requirement according to the following formula: Time requirement = Tr + Te /lot size * quantity NOTE: If "quantity" is registered as a value in the field, it is overwritten by the result of the formula evaluation by opening the BOM. |
Formula Quantity Per | An alternative to the Quantity per field; enter a formula for the calculation of the component quantity. Choose the ellipsis button to open the Formula Editor. |
Recalculate | If selected on a BOM line, then this line is often transferred to the Document BOM, as the Exp. Quantity is calculated or registered. The variables used in a support BOM are supplemented before calculation of the formula around the contents of the counting variable "i". In addition, the syntax #i# must be used. For more information, see Integration of Master BOMs and Automatic Sub-Checklists. |
Formula Setup Time | For a work center or machine center, the necessary setup time can be calculated through a formula. Choose the ellipsis button to open the Formula Editor. NOTE: If a value is registered in the Setup Time field, it is overwritten by the result of the formula evaluation by opening the BOM. |
Formula Run Time | For machine centers or work centers, the necessary run time can be calculated through a formula. Choose the ellipsis button to open the Formula Editor. NOTE: If a value is registered in the Run Time field, it is overwritten by the result of the formula evaluation by opening the BOM. |
The following table describes a sequence of tasks, with links to the topics that describe them.
To | See |
---|---|
Calculate the validity of a component. | Formula Valid |
Calculate the expected quantity of a component. | Formula Quantity |
Calculate the expected quantity per of a component. | Formula Quantity Per |
Calculate the setup and run times of a work or machine center. | Formulas for Setup and Run Times |
Use pre-defined variables to calculate values and transfer data to document BOM/construction BOM/master BOM/items. | Pre-Defined Variables |
Transfer the value in the Input field on checklist line to description fields in Document BOM/Construction BOM. | Free Text |
See Also
Feedback
Submit feedback for this page .