Creating Construction Orders from Job Planning and Processing Line
In COSMO Discrete Manufacturing, a company's engineering or construction department can use the construction order for managing the BOM prior to manufacturing. Therefore, the construction order is considered the work order for the construction department. The design engineer has the option of modifying the document BOM created by sales or creating a new BOM. In this case, they have access to the checklist.
In the Job Planning and Processing page, the Construction Order procurement channel provides the ability to create construction orders for the job lines outside of the Job Budget Calculation, which can then be transferred to the Production module. Document BOMs that exist for the job line will be transferred to the new Construction Order.
After planning and releasing, the Construction Order is created based on the Document BOM if one exists.
The Job FastTab in the Construction Order provides information specific to the related job.
If a Document BOM does not exist for the job line, one can be created from the Construction Order.
In the Construction Order, choose the Request BOM action on the Home menu to create the Construction BOM from the Master BOM assigned to the item.